- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
现浇箱梁跨越高速公路支架施工方案及计算书(国外英文资料)
现浇箱梁跨越高速公路支架施工方案及计算书(国外英文资料)
Xx province across the shanghai-hangzhou highway engineering corporation account
The bridge of the bridge, the bridge of the Shanghai and hangzhou, the concrete and the frame of the bridge
First, the general situation of the project
The cross section of the cross section of the cross section of the section of the section of the section of our section, the design of the cross section of the cross section of the cross section of the cross section of the cross section, the three room prestressed concrete box beam, the beam height 1.6 m. The span is 24 + 25 + 2 * 30 + 25 + 24, the bridge is 16.75 m by 2, the base width 12.75 m, the single wing plate width 2m, the beam height 1.6 m. The transverse slope of the box is rotated by the top, the top and the bottom of the bridge are horizontal and the board is vertical. In the box girder, the bottom plate set up the vent, the diameter is 8cm, each plate is set two on each side, and the stomata is at the height of the bottom of the board. The distance between the beam and the beam is 2m. The bottom panel is located in the middle of the room and corresponds to the abdominal plate. Prestressed steel beam using ASTM416-97 standard of high strength, low relaxation level 270 Φ j15.24 mm steel strand, the standard strength the Ryb acuity 1860 mpa, nominal size = 140 ㎜ 2 A. The main line is K3 + 907.148, and the highway has been given the pile number K * * + * * (the road base width 35m), and the intersection Angle is 53.458 o.
Second, the proposal introduction
Due to * * high-speed, high-speed two lines are located on the right curve and continuous cast-in-site box girder by xx viaduct bottom elevation and the limit of highway road surface elevation, and also need to normal maintenance of expressway opened to traffic, ensure that temporary support to traffic clearance requirements. According to the actual situation of the site and the experience of previous site, the construction procedure of continuous b
您可能关注的文档
最近下载
- 中医外科学期末复习.pdf VIP
- 生产车间划线标识执行规范.pdf VIP
- EDA软件:Cadence Allegro二次开发_ CadenceAllegro数据库操作.docx VIP
- 物性表_威格斯 PEEK VICTREX® PEEK 450G.pdf VIP
- 让我们一起去追“星”!——两弹一星之核弹老人魏世杰 课件--2023-2024学年高二下学期爱国主义教育主题班会 (1).pptx VIP
- (2025秋新版)部编版二年级语文上册全册教学设计.pdf
- 《领导力》培训课件ppt.pptx VIP
- 运输车队长绩效考核表.xlsx VIP
- 驾校一点通摩托车科目一题库400题讲解 .pdf
- 印尼二手车市场研究及业务建议.pdf VIP
文档评论(0)