- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
造价员考试习题(国外英文资料)
造价员考试习题(国外英文资料)
The indirect cost of the construction of the world bank project in the following projects is ().
The expense of the outside facilities
B. the salary of the construction management personnel
C. service building fee
Vehicle charge
Answer: B
The original price for domestic equipment is not () in the following price.
Delivered price
Contract price
Cost price
Supplier quotation
Answer: C
When calculating the original price of domestic standard equipment, adopt ().
A. no spare parts cost
The original price calculated by the fixed valuation method
C.I.F. value
The original price of spare parts
Answer: D
4, imported equipment, known on fob basis of $5 million, the international freight rate is 7.5%, transport insurance rate is 4%, tariff rate is 15%, value-added tax rate is 17%, the consumption tax
The tax rate is 10%, and the tariff on the device is () 10,000 yuan. (1 dollar = 8.10 yuan) a. 6780
6102 B.
4535 C.
5215 D.
Answer: C
When calculating the cost of imported equipment, the cost base is imported equipment ().
Land price
F.O.B.
C.I.F. value
Middle price
Answer: A,
All activities in the banana map start at the latest.
A. there is A disadvantage to the interest in the construction of capital loans.
B. Low the guarantee rate for completion of the project,
It is advantageous to save money on construction funds
Improved the guarantee rate of project completion,
Answer: the BC analysis: in general, all activities according to the latest start time, is advantageous to save the construction fund loan interest, but also reduces the project completed on schedule reliability, therefore must close
To determine the investment expenditure budget, to achieve both the investment expenditure and the purpose of the project period
In the case of the double code time scale network plan, () is the key line.
A. from the end node to the starting point, the path of the waveform is not seen from the beginning,
B. The start time of all the work on the line is the same as the b
您可能关注的文档
- 日施工进度表 2011年3月12日(国外英文资料).doc
- 易达科讯scm供应链系统(国外英文资料).doc
- 普通话zcs(国外英文资料).doc
- 智能公共交通系统 使用(国外英文资料).doc
- 普通钢屋架设计例(国外英文资料).doc
- 最新公路工程竣工验收办法实施细则2013(国外英文资料).doc
- 有朝气蓬勃的学生(国外英文资料).doc
- 期末复习四选择题专项训练(国外英文资料).doc
- 本部单厂课程设计任务书2013.12.18(国外英文资料).doc
- 机械可靠性结构强度计算(国外英文资料).doc
- 金属塑性成形原理期末复习(国外英文资料).doc
- 原发性肾病综合征的护理(国外英文资料).doc
- 造价员考试模拟题一(国外英文资料).doc
- (SYD0754)乳化沥青粘结力测定仪(国外英文资料).doc
- (传统和韵与现代风潮的完美融合) Allen Lee --(温泉度假酒店+金地檀郡LOFT样板间)【名师联860期】(国外英文资料).doc
- (一)单代号搭接收集时间参数的计算与关键线路切实实在定(国外英文资料).doc
- (天然纤维)(国外英文资料).doc
- (宋明清修建风格特点与代表结构).JPG(国外英文资料).doc
- (接地)-02 扁钢接地(国外英文资料).doc
- (正线旌旗灯号)呼和电务段全员标准化功课培训测验卷谜底(国外英文资料).doc
文档评论(0)