- 1、本文档共18页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
公路交通优质工程奖评比办法(国外英文资料)
公路交通优质工程奖评选办法(国外英文资料)
Method of selection of highway traffic quality engineering awards
Chapter 1 general rule
Article 1 with a view to encouraging working units to strengthen the highway construction quality management, improve the quality of project, the investment benefits, on the basis of the highway law of the Peoples Republic of China and the relevant provisions of the state, these measures are formulated.
Article 2 the high quality engineering award of highway traffic is the highest quality award in the national highway construction industry, and the first, second and third prizes are awarded.
Article 3 the award of high quality engineering is awarded in principle once a year.
Article 4 the China highway construction industry association shall be responsible for the selection of quality engineering awards under the leadership of the ministry of communications.
Chapter ii standards of selection
Article 5 the award of quality engineering shall be judged by the following criteria:
(1) to comply with the requirements of the relevant state laws, regulations, technical standards and highway engineering survey, design, construction standards and procedures;
(2) management standards, advanced concepts, scientific methods and innovations;
(3) to promote the use of new technologies, new technologies, new materials, new equipment, and technological innovation;
(4) to meet the requirements of safety, environmental protection, beauty and harmony;
(5) the rules for the management of funds shall not be overestimated by the completion of the completion of the project (including the revised estimate), and the non-payment of the project shall not be in arrears;
(6) the actual period of construction shall not exceed the contract period.
(7) no serious and serious safety accidents occurred.
(8) the quality of the project and the comprehensive evaluation of the construction project are excellent, and the quality grade of the main project contract is excellent;
Article 6 the over
您可能关注的文档
最近下载
- 小学体育_队列队形教学设计学情分析教材分析课后反思.doc
- 中建项目商务策划汇报模板.pptx
- 公路中小跨径钢-混组合梁桥标准图集(制订)》技术方案报告.docx
- “设计思维与方法”教案.ppt
- 大职赛生涯闯关参考答案.docx VIP
- 2022《美宜佳公司营运资金管理存在的问题及对策研究》开题报告文献综述(含提纲)3200字.docx VIP
- 长垣市人民医院西学中培训班《方剂学》考试.pdf VIP
- 苏教版一年级科学上册4.1《自然物与人造物》(课件).pptx
- 电子商务招聘简章模板.pdf
- 统编版小学语文二年级上册第六单元 先辈伟人 大单元整体学历案教案 教学设计附作业设计(基于新课标教学评一致性).docx
文档评论(0)