屋顶大跨度下悬索钢梁施工(国外英文资料).doc

屋顶大跨度下悬索钢梁施工(国外英文资料).doc

  1. 1、本文档共9页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
屋顶大跨度下悬索钢梁施工(国外英文资料)

屋顶大跨度下悬索钢梁施工(国外英文资料) Construction of steel girder under the roof of the roof In jiangsu province su zhong construction group co., LTD. Gu mingchun Graduate school of Chinese academy of sciences of zhongguancun building engineering one of top ten excellent design work of Beijing in 2002, the project is located in the haidian district of Beijing zhongguancun south a no. 3. The project is made up of two buildings in the south and north, and the two buildings are between the two buildings. The east and west facades of the atrium are made of glass curtain wall and semi-hidden glass curtain wall, and the top is a reversible glass skylight. At the top of the east entrance of the building, there is a 144m2, 48-m suspension steel structure. All the loads in the canopy are passed to a lower suspended cable beam with a span of 29.034 m. In addition, the beam also bears half of the surface load of the glass skylight of 180m2 on the other side. The value of the load on the beam is calculated to be 15.662 KN/m, the maximum bending moment value of 1469KN m, and the basic air pressure value is 0.35 KN/m2. The beam is 22.10 m from the ground and the beam body weighs 84.6 KN. Design of girders The main beam is welded with Q235 steel plate, the cross section is H700 x 450 x 16 by 25, the upper and lower flaps are 25mm thick, the abdominal plate is 16mm thick, and the stiffening plate is 14mm thick. The stiffening plate is arranged along the length of the beam, the distance is 1.8 m, and the beam is properly encrypted. The bending moment of the girder is borne by the upper chord, and the string control of the lower string is controlled across the middle. The steel strand pretensioned the 55KN force to resist the bending moment 110KN m. After the calculation, the total disturbance of the girder was 148m, and the beam body precamber 83.7 mm to offset the self-disturbance, the actual disturbance was 64.3 m. The beam form is shown below: Construction of girder 1, factory preweld Because o

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档