栈桥施工技巧交底(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
栈桥施工技巧交底(国外英文资料)

栈桥施工技术交底(国外英文资料) Attached table 29: technical background book (1311) Technical clarificaiton book Table number 1311 The project name TieSiJu group co., LTD. In the salt Ⅲ marking a division for the first frame First page co Clarificaiton number LY Ⅲ - Ⅰ - QLJD - 1 The name of the project The right line of salt is the cross of the rose river and the huai river bridge Design document number The construction site Construction of adjacent line, block of block Date of disclosure The 2014-07-19 Technical background: The foundation is applicable to the construction of the left line of the cross rose river. Design situation: A steel trestle bridge is built on the construction platform of the girder bridge. Pier 6 m wide, base the phi 529 (delta) = 8 mm steel pipe pile, steel pipe pile cross arm adopts double I40a i-steel, upper with single not reinforced bailey beam (group 3) structure form. The beam of I20a is set on the beret beam. The beam is covered with decorative pattern plate with 10mm thick. The steel pipe pile of pier bridge is adopted [20 channel steel connection to enhance the overall stability of the bridge pier structure. The conditions and preparations for starting construction: The material approach to the entrance and acceptance, the mechanical approach acceptance and acceptance, the personnel training is qualified, the certificate is on duty. Construction techniques: Pier by chase to the middle of the river on both sides of the Taiwan across the construction, steel pipe pile with 100 t crawler crane was DZ90 hydraulic vibration hammer sinking, and then in 100 t crawler crane beam installation, bailey and pier construction, such as panel laid the crawler crane, after the completion of complete pier construction step. The main procedure of the piers and the process flow chart of the construction process are as follows: The construction process of the piers is set up Process flow chart of piers bridge Production of steel pipe pile (1) steel pipe pile adopts p

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档