- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
桥梁工程模拟试卷(国外英文资料)
桥梁工程模拟试卷(国外英文资料)
Bridge engineering simulation test paper
1, fill in the blanks (1 minute, 20 points)
The bridge is usually composed of the upper structure, the lower structure and the attached structure.
The structure of the bridges load-bearing structure and the bridge deck are the structure of the bridge. The lower structure of the bridge, the bridge and its foundation; The bridge head embankment, the cone-shaped slope, and the revetment of the shore make up the structure of the bridge.
A porous bridge spans the length of an Ld. The porous arch spans the length of Ld.
4. Clear stream crossing bridge H0 is refers to the distance.
The general specification of highway bridge design (jtj021-89), which stipulates that the highway bridge should be followed,
Design the principle of .
6. One of the basic requirements of highway bridge design is: all parts of the whole bridge structure and its components are in the process of manufacture, installation and use should have enough,,, and.
The bridge is included in the bridge.
Two, the choice (3 points, 30 points)
The total gravity of the heavy car in the motor-20 fleet is ().
A.300kn
The unit of the monolithic reinforced concrete plank bridge is ().
A. whole weight board b. 1m wide band
C. load the width of the board d. the width of the lane
The place where the arch differs from the beam and column is that it has () under the vertical load.
A. bending shear c. b. d. axial pressure horizontal thrust
For four-lane Bridges, four lines of gravity can be reduced () in the design calculation, but no less than two lines of team calculated.
A. 70% b. 30% c. 25% d. 5%
For cross-river Bridges, the pressure of flowing water belongs to ().
A. permanent load b. basic variable load c. other variable load d. accidental load
6. A bridge pavement, use load combination Ⅲ for checking ().
A. the load of the people is needed
C. the population of 1.4 times the load D
The centrifugal force of the vehicle load should be calculated when the curve
您可能关注的文档
最近下载
- 2024-2025学年广东省深圳中学九年级(上)开学数学试卷(含详解).pdf VIP
- 通桥(2014)2132-Ⅳ(跨度31.5m) (附条文及目录 ).pdf VIP
- 儿科学麻疹病例分析,病例导入法.docx VIP
- 燃煤锅炉超低排放治理工程项目实施方案(参考).docx
- 24012NDS00 NDS试验测试标准.doc VIP
- 2025年抗日战争胜利80周年公基常识题目20道及答案.docx
- Unit 3 Amazing animals 大单元整体教学设计 新人教PEP三年级英语上册.docx
- 复兴路加装电梯施工组织设计.doc VIP
- CJ/T 120-2016 给水涂塑复合钢管.pdf
- 130吨履带吊性能表 中联QUY130.pdf VIP
文档评论(0)