水电施工基础常识(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
水电施工基础常识(国外英文资料)

水电施工基本知识(国外英文资料) 1, hutch to interview water: 1, the ground is filled with water, the water level should not be above the threshold level of the hutch, otherwise the water will flow to the hall and the bedroom. Every water in the water is filled with water. The ground must try water for more than three days or a week (some of it is leaking), and the water will be tested for a day. Water leakage diagnosis: after water test, check the roof of the building. To determine the leakage and leakage according to the leak in the scene. The leak is a leak that will occur in an hour. Leakage is a phenomenon of the upper surface humidity that occurs over three days in the ground, and the increase in time is increasing. 3, leakage treatment: Ming Ming have a drain pipe wall leakage and leakage trap leaking two cases, if encounter with the site casting outlet water drain pipe wall lateral, must put dry interview of water and let dry ground. Tap on the outside of the wall of the tube and then pour the waterproof glue on the outside of the wall. This is easy, if you have a leak in a water trap. Otherwise, it is OK to check the leaking of the head screw and the leaky pipe wall. Ive seen a couple of home furnishings that are leaky. Once the leak is done, try the water again. 4, do waterproof construction method, hutch defends pulp are swept out of the ground first, and then ground and seed beam part clean, had better wash with water, the ground of the sand dust clean. Ground dry for a few days again, until the ground skin look for white color dry state (such as ground fill slag, slag must be dug to fill out between hutch defends to ground cleaning). After the ground is dry, can brush waterproof glue, the weather is good condition the day once again, three times is advisable. Once the waterproof glue is done, test the water twice. 2, water and electricity installation, water and electricity installation is crucial concerns outfit, the most relative concern of the owner, so dont be fri

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档