沉落观测点若何设置(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
沉落观测点若何设置(国外英文资料)

沉降观测点如何设置(国外英文资料) How is the settlement observatory set up The basic requirements of settlement observation ?? The requirement of equipment and personnel quality ?? According to the characteristics of the settlement observation accuracy high, in order to accurately reflect the building, the settlement of content under constant load, the general provisions of measurement error should be less than the deformation value of 1/10-1/20, and therefore should be used for settlement observation precision level (S1 or S05 level), grade rod should also use affected by environment and temperature changing small high precision level ruler indium alloy. Use a ruler to use the first ruler if you dont have the metal level of indium. ?? Workers must receive professional learning and skills training, familiar with instrument operation procedures, familiar with measurement theory, can according to different engineering characteristics, the specific circumstances in different observation method and program, and can analyze the reason of problems in the process of implementation and adjustment is calculated correctly using the error theory, on time, fast and accurately complete each observation mission. ?? Observation time requirements ?? Built, the settlement observation of things has strict restrictions to the time, especially for the first time observation should be carried out on time, every stage of the other survey, according to the progress of the project should be carried out regularly, missing or offset is not allowed. Only in this way can the accurate settlement condition or law be obtained. Adjacent two time interval is called an observation period, the general settlement observation of high-rise buildings in a certain time period for the observation period (such as: 30 days/times) or by loading situation every layer of the building (or layers) is an observation period, no matter what way must be observation cycle on time as stipulated in the measuring scheme. ?? The require

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档