混凝土施工计划参考资料(国外英文资料).docVIP

混凝土施工计划参考资料(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土施工计划参考资料(国外英文资料)

混凝土施工方案参考资料(国外英文资料) This article is contributed by coffee in 1989 Doc documents may have a poor browsing experience at the WAP end. It is recommended that you choose TXT, or download the source file to the native view. Reference materials for concrete construction projects (for reference only) First, the construction of the project is a new teaching complex in rongchang renyi middle school, and the building is 5 floors. Covers an area of 6984.85 ㎡. The construction and deployment of this project shall be of commercial concrete. According to the arrangement of the construction process and time limit for a project, concrete pouring to arrange as far as possible in the daytime, concrete pouring, the operation management to classes, responsible for inspection, at the same time to do a good job of coordination. The main machine tools are ready The size of the tower hoisting 50 vibratory vibrator is the number 2, 6, 2, 2 Architecture is the framework. Total construction Three 1, technical preparation, construction preparation (1) according to the requirements of engineering design drawings, the dig-hole pile engineering foundation, constructional column, filling the top grade of C25 concrete ring beam, parapet wall pressure. The rest of the concrete grade is C30. (2) before concrete pouring, the implicit preview process must be inspection, including steel, template engineering and related with the professional, and made the transition and work process, can for subsequent construction. (3) the thermal insulation of concrete maintenance and block work, under the normal temperature condition, need each block in the 2 groups: the raise a set of test (28 days), with the condition maintenance a set (600 ℃. D). 2, the material preparation To contact and implement the concrete in advance, calculate the quantity of concrete and determine the amount of materials. Ensure adequate material for construction. Prepare (1) according to the amount of concrete, prepare the corresponding q

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档