- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土浇注方法(国外英文资料)
混凝土浇注方法(国外英文资料)
Method of concrete pouring
First, the concrete should be watered immediately, and the water should start from a corner or a place, gradually expanding to the surrounding area. The concrete should be layered and rammed, and the thickness of each layer shall be 200mm, no more than 1.25 times the part of the insertion vibrator.
Two, the surface of the template is clean, the combination is rigorous, the support is strong, each dimension meets the requirement.
3, the water concrete should not be isolated, and the height exceeding 2M should fall in the pipe, inclined trough or string.
Fourth, the concrete should be poured into a continuous, such as interrupt for pouring system is more than the initial setting time, then you must wait for the compressive strength of concrete reaches more than 12 kg/cm2, will play hair surface, wash with water, and then poured a congruent with the original concrete layer of mortar, continue pouring system.
When watering, check the template and support for deformation, sinking, moving, or running pulp, such as finding that it should be dealt with immediately.
Six, vibrator, the operation will make its natural inserted smoothly, to do fast plug slow pull principle, mainly to prevent segregation phenomenon and a vibrator with concrete under the pull out form when empty.
The depth of the vibratory rod is usually 50 ~ 100mm into the lower concrete, and the point is inserted into the movement, evenly, not missing.
Eight, vibrator not impact reinforcement and templates, vibrating time should be sufficient, good grasp of the vibrating time generally each interpolation point about 20 ~ 30 seconds, the shortest not less than 10 seconds, prevent leaking of vibration and vibration. No longer significant sink to concrete surfaces, and without a lot of bubbles radiant with advisable, should pay special attention to marginal parts of the vibrating, italics, vibrating, ensure the real outside light in the concrete.
Nine, concrete vibrators
您可能关注的文档
最近下载
- 2025至2030全球及中国普拉提和瑜伽馆行业市场深度研究及发展前景投资可行性分析报告.docx VIP
- 极速60秒.ppt VIP
- 中国宠物行业白皮书.doc VIP
- 项目插花艺术-全校公选课.doc VIP
- 极速60秒的图片.ppt VIP
- 展频IC规格书之 SSDCI1108AF _REV3.1.pdf VIP
- 2024 CCF非专业级别软件能力认证(CSP-S)第一轮真题.pdf VIP
- TCFNA6104-2022 食品安全-月桂叶(香叶).pdf VIP
- 人美版(2024)小学美术一年级上册《欢快流畅的线》教学设计 .pdf VIP
- 三水平立井多绳摩擦式提升机提升钢丝绳更换安全技术措施:.doc VIP
文档评论(0)