- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
混凝土梁板柱模板除往计划(国外英文资料)
混凝土梁板柱模板拆除方案(国外英文资料)
Construction plan for concrete beams, plates and columns
Construction measures for the demolition of the template
1, the bearing side form (wall of die and mould and beam side die) should be to ensure the concrete surface and the edges are not subject to damage (greater than 1.2 MPa) to dismantle, about 24 h ~ 36 h, determined by block with conditions.
The condition of the construction of the bearing form (girder, board and bottom die) shall be carried out according to the quality acceptance specification of the construction quality of concrete structures (gb5020204-2002). Concrete pouring over a period of time, sending with curing of concrete block under the condition of laboratory test, according to the strength of the laboratory to issue report, determines the time of the template and measures, by the technical director to issue notice to dismantle, can tear open mold.
3, the order of the removal of the template is the reverse of the order in which the template is installed.
(1) the column template is removed
After the concrete strength reaches 1.2 Mpa, the column can be removed when the surface and Angle are not damaged. Mould demolition, the first dismantled rod or brace, then top-down, dismantling column hoop to demolish part shaft and finally carefully with the template from flowing to the outside with a crowbar or gently pry the tap, to loosen the template from column concrete, demolition of people standing in the operation on the shelf, can not stand on the template. It is strictly forbidden to use hard pry so as not to injure the corners of the concrete and prevent the deformation of the form. The column of the demolition leans on the outer shelf in turn, and when the entire column template is removed, the template is shipped in time.
Floor die and floor plate are removed
The beam and floor template should be removed first, then the bottom die of the floor and the bottom die. The order is as follows:
Rod, scissors demolish part horizo