灌桩注意事项(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
灌桩注意事项(国外英文资料)

灌桩注意事项(国外英文资料) Pile notice The reason of pipe plugging in the construction of bored pile concrete In concrete construction are often bored piles of catheter jam phenomenon (referred to as card), the reasons for this phenomenon are: 1. The tube flange leakage (permeable). The inside of the catheter is separated by a layer of water, where the inner concrete is not flowing and the catheter is blocked. The inside of the catheter is separated by air pack. Similarly, the inside of the catheter is not flowing and the catheter is blocked. Pipe cracks. The wall of the tube was too thin in the construction to be violent, causing the wall of the pipe to crack, and he caused a crack in the wall of the pipe. Cracks, hole water pressure is bigger, the water will tube concrete dilution, segregation, make concrete loss of liquidity and increase the friction of guide wall concrete, resulting in congestion. 4. Used in the concrete construction sand, stone and other raw materials distribution unqualified or water cement ratio is not correct and segregation of concrete, stone and sand deposit in catheter bottom, slurry floatation; In the construction, the requirement is not strict enough, and the actual requirement has a great deviation, and the precipitate segregation rate is accelerated. 5. Concrete pouring process of discrete and continuous time is too long, or adjust the infusion process time is too long, already pouring underwater concrete, also can appear catheter jam. At the beginning of the irrigation, the pipe was blocked by a water plug. All of these reasons can not be carried out normally in the construction of bored pile concrete. Secondly, according to the analysis, it is pointed out that reasonable avoidance and solution should be found Above has appeared in concrete construction of bored piles of catheter jam causes are analyzed, how to avoid and solve the catheter jam, should be sufficient attention in the actual construction and timely solve. Talk about how to avoid a

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档