煤矸石路基填筑施工总结(国外英文资料).docVIP

煤矸石路基填筑施工总结(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
煤矸石路基填筑施工总结(国外英文资料)

煤矸石路基填筑施工总结(国外英文资料) Summary of construction of coal gangue subgrade Yang Xingbao Middle East road bridge north China engineering co., LTD., LTD., the green land project division 9 contract Use coal gangue to fill in the background of the road Dragonhead high-speed 9 contract section of the road along the shortages of local earth very land soil is very difficult, and handan major industrial region, has a lot of residual coal gangue piled up into a hill, around to solve the problem of shortage of highway soil source, I project department comprehensive consideration to using coal gangue filling roadbed. Use coal gangue to fill the roadbed feasibility The technical performance requirements of the roadbed coal gangue According to the research of coal gangue, and the technical specification for construction of highway subgrade and specification for design of highway subgrade, combined with previous research experience data, coal gangue as fill roadbed road bed material shall meet the following requirements: The coal gangue shall be used for more than five years and shall not be used for coal gangue. The loss of the strength of the coal gangue in the mud is caused by the decrease of the load capacity of the roadbed, which directly affects the performance of the road. 2.1.2 use natural grade with better coal gangue. A well-matched coal gangue can be crushed to form a dense structure. The coal gangue, which is of natural grade and large particle, should not be used as a direct route packing, but it can be improved by the process of crushing or mixing powder. 2.1.3 filling the compaction degree of 96% gangue foundation shall have the maximum particle size less than 100 mm, the degree of compaction of 94% gangue maximum particle size of subgrade reclamation shall not be greater than 2/3 of layer thickness should be less than 200 mm; The water content of the roadbed is controlled by the optimum water content of plus or minus 2%. Stability indicator: The proposed coal gangue st

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档