第5章 混凝土溢流坝和坝身泄水孔(国外英文资料).docVIP

第5章 混凝土溢流坝和坝身泄水孔(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第5章 混凝土溢流坝和坝身泄水孔(国外英文资料)

第5章 混凝土溢流坝和坝身泄水孔(国外英文资料) Chapter v the concrete overflow dam and the drainage hole of the dam Section 1 overview The dam body has the overflow surface, the bottom hole, the middle holes gravity dam is called the drainwater gravity dam. It is both a drainage and a water block. So it must meet the requirements of the stability of the water retaining structure strength, should also meet good flow condition, the solution or water to buildings possible cavitation erosion, the vibration as well as to the downstream scouring. 1, the drainage way of the water gravity dam The top of the dam is overflow Through water on the top of the dam, the water head is small and the aperture size can be large. When the gate is fully open, the flow rate is directly proportional to the third of the water head The gate is open and convenient to check for repairs. It can drain ice and other flotsam, but it cant be predicted. Large orifice overflow To reduce the height of the dam in order to meet the pre-release requirements; Use the chest wall to prevent water from reducing the gate height; In low water, the chest wall does not affect the discharge flow, the same as the barrier discharge. The chest wall can be made into movable type. When the water level is low, no water supply and no maintenance can be found. Deep drain hole The flow state of the hole can be divided into the pressure leakage hole and the non-pressure drain hole The flow rate is proportional to the half of the water head, and the excess capacity is small. The water head is high in the floodgate, and the operation and maintenance are complicated. The water supply, pre-release, discharge, discharge and construction of downstream water supply; The above three ways have distinguishing feature each, comparing should be combined with the specific circumstances, can generally be used, but to simplify the structure, convenient for construction and utilization, unfavorable and overmuch. Section 2 concrete overflow dam The determinat

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档