- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第七章 施工阶段对工程造价的操纵(国外英文资料)
第七章 施工阶段对工程造价的控制(国外英文资料)
The serial number should be small and large, not continuous, but strictly forbidden to repeat.
Network planning technology
The double code network diagram and its components
Start node (arrow) completion node (arrow node)
i.
The arrow tail
Work name job time
The arrow line
j
The arrow
Second, the drawing rules
1. Must be correct to express the logical relationship is set 2. 3. It is forbidden to appear circuit between nodes are strictly forbidden to have a two-way arrow or no arrow attachment 4. The arrow line should not be crossed, when the cross is inevitable, available over a bridge or point to the method as shown in figure 7-6
Network planning technology
Second, the drawing rules
There should be only one starting point, and there should be only one endpoint node in the network diagram of the uninstallable task. Use a bus to draw a line of outgoing arrows or multiple internal arrows. No more than two arrows will start from one node at the same time and point at the other. The same work cannot be expressed more than twice in a network diagram.
Time parameter calculation
H goes to I, j goes to k
Working h-i is a hard working job for i-j
Di? j
The duration of the work
Network planning technology
Time parameter calculation
(1) working as early as the start of the work I? The computation of the first time of the j starts at the starting point of the network diagram and sets its value to zero. Then, the direction of the arrow line is calculated.
ESi? J = Max {ESh? I + Dh? I}
This work is the earliest start time
The duration of the work
The first time to work is the earliest
(2) work as early as possible? J is the earliest possible time for the work to be completed.
EFi? J = ESi? J + Di? j
Network planning technology
Time parameter calculation
(3) the computation period of the network plan is the maximum amount of time that the final work will be completed at the end of the period
Tc
Tc = Max {EFi? N}
Project construction period
The final work