第九章 水利关键安排谜底(国外英文资料).docVIP

第九章 水利关键安排谜底(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第九章 水利关键安排谜底(国外英文资料)

第九章 水利枢纽布置答案(国外英文资料) Chapter ix the solution of the water conservancy project A, fills up the topic The main task in the feasibility report stage is to demonstrate the feasibility, economic rationality, and the necessity of constructing the project. 2. The selection of water conservancy hub layout from design, construction, management, technical, economic comprehensive comparison selected the optimal solution. The bend of the road should be arranged in the lower part of the concave bank. Second, the short answer What is the stage of the design of the water control center? Explain the design tasks of each phase. The feasibility of the engineering technique, the economic rationality and the necessity of construction (2) the preliminary design stage: select the optimal scheme, dam, dam type selection devices, such as resettlement planning is put forward, select construction diversion scheme, detailed construction scheme and technical measures to clarify engineering benefit, put forward a general estimate. (3) technical design and construction drawing design phase: to detail design, the research foundation treatment scheme, detailed construction scheme and construction technical measures, construction schedule and construction budget, etc. How does water control affect the environment? (1) the impact on the upstream of the submerged: indicates high water level reservoir formation, and swim upwards, flood damage, water after the rise of ground water level, may cause the ground temperature drops, the surface swamping and salinization, we are born and harmful microorganisms. Due to the high water level, the bank was submerged and the slope was unstable and the landslide threatened the reservoir and the downstream safety. (2) the impact on the downstream: sedimentation after makes a long river downstream riverbed serious incised, the water drops, channel, condition change caused by scouring and silting in riverbed, direct influence on both sides of the embankments, shippin

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档