第二十一章、模板工程( 易达定额说明)(国外英文资料).docVIP

第二十一章、模板工程( 易达定额说明)(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
第二十一章、模板工程( 易达定额说明)(国外英文资料)

第二十一章、模板工程( 易达定额说明)(国外英文资料) One, the present concrete template is pressed by different components, with the plywood template, the wood template, the steel support and the wooden support system. When the height of the beam and plate is 3.6 m, the height of the set is 3.6 m. When the height above 3.6 m, more than part of each increment of lm is calculated. When the height of the set is 10 meters, the height of the set shall be 10m. When the height exceeds 10 meters, more than part of the module is calculated according to the corresponding increase of lm. When the mode height reaches 20m, a height of 20m is applied to the corresponding suborder. When the mode height exceeds 20m, more than one part is calculated according to the corresponding increase of lm. When the height exceeds 30 meters, the construction plan will be determined separately. When the height of the column and wall is 3.6 m, the corresponding children in the height 3.6 m are used. When the height above 3.6 m, more than part of each increment of lm is calculated. When the die height reaches 10 MB, the corresponding suborder of 10 MB is applied to the set. When the height exceeds 10 meters, more than part of the module is calculated according to the corresponding increase of lm. When the mode height reaches 20m, the corresponding suborder of a height of 20m is applied. When the mode height exceeds 20m, more than one part is calculated according to the corresponding increase of lm. When the height exceeds 30 meters, the construction plan will be determined separately. The height of the floor is the height of the floor. The pavilion panel is high above the eaves line. The floor of basement floor is more than 3.6 m and each additional 1m is calculated according to the number of works day, steel support and vehicle load times coefficient 1.20. The pool is calculated according to beam, board, column and wall. Vi. The different column and shear wall are divided in one direction: The height of the balcony and

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档