- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
综采任务面装备回撤平安质量标准化标准(国外英文资料)
综采工作面设备回撤安全质量标准化标准(国外英文资料)
The standard of safety standards for safety quality of the fully mechanized working face is removed
In order to strengthen the safety quality management of the retracement of the fully mechanized working face equipment, ensure the quality of the recovery equipment and the quality of the retracement of the equipment, and eliminate the injuries of minor injuries; Eliminating one or two non-fatal accidents; The elimination of electrical failure; Special standard.
Quality technology management
Prior to the withdrawal, the examination and acceptance by the mining organizations shall be subject to acceptance and acceptance of the documents.
The survey record of the equipment condition of the fully mechanized work area and the route of supporting transportation.
3, regulation measures
(1) the procedures of the procedures are improved, the narration is clear, the chart is complete and complete, and the site is highly operational.
(2) the approval and implementation of the examination and approval shall be carried out in a timely manner, and the major technical leaders of the competent departments for examination and approval shall participate in the examination and approval, and study the implementation of the time, the number and the detailed records.
(3) special measures, such as special measures, maintenance of roadway, and the treatment of death racks, shall be completed in the event of changes in field conditions.
Second, working face coal wall and roof management
1, the hydraulic support (pillar) of the working side shall be numbered and managed, and the number is clear. The hydraulic system has no leakage, fluid, the component is not defective, the line is not compressed; The brackets are tight and no automatic sinking.
Remove the management of the way support
(1) from bridge USES the anchor net support, withdraw after completion of construction, bridge road, channel at the top to have no obvious sinking, there is no back, replace phenomen
您可能关注的文档
最近下载
- 附着式升降脚手架施工方案范本.pdf VIP
- 小学四年级英语阅读理解30篇及小学四年级英语作文.doc VIP
- 电梯安装工程管理重难点分析.doc VIP
- 2025年保安员资格证考试题库大全(答案附后面).docx
- 【高考必备】高考总复习系列丛书-高三化学一轮复习考点优化设计(第五辑):考点六十三等效平衡Word版含解析[原创精品].doc VIP
- 米家小米智能门锁 E30使用说明书.pdf
- 统编版道德与法治八年级上册《诚实守信》说课课件.pptx VIP
- 第一单元峥嵘岁月 第1课情感表达 教学设计 人教版初中美术七年级上册.docx VIP
- 大班幼儿参与幼儿园物质环境创设的现状及提升策略.docx VIP
- 省优秀科组申报材料.pdf VIP
文档评论(0)