交工 园林绿化工程完工总结申报(国外英文资料).docVIP

交工 园林绿化工程完工总结申报(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
交工 园林绿化工程完工总结申报(国外英文资料)

交工 园林绿化工程竣工总结报告(国外英文资料) Nanhu yingbin avenue (outer ring - high speed segment) green renovation project Submit the report of the contract First, the general situation of the project Yingbin avenue south lake (outer ring - high-speed section) greening project built by xiamen Xia Sheng landscape construction group co., LTD., the company designs, tangshan traffic construction engineering supervision consulting co., LTD, supervision, project is divided into during the construction and maintenance period. This project includes the reclamation of soil, the cultivation of soil, the transformation of the terrain, the drainage of water, the planting of afforestation and the afforestation and maintenance. From July 6, 2010 to July 26, 2010, the construction and maintenance project of the owners tendering document and contract is completed. Second, engineering characteristics More than 1, the tight, area: the south lake yingbin avenue (outer ring - high-speed section) greening project, is the highway interchanges, the total is divided into eight regions, according to this, I take the area of construction, at the same time clear date, reasonable arrangement of regional construction to ensure constant total duration. 2, high-quality requirements, design and adjust the number of times: to improve the landscape effect of highway interchanges, the construction unit based on absorbing the experience of road greening in tangshan city, and to the south lake yingbin avenue (outer ring - high-speed section) greening project put forward higher requirements. In order to adjust and adjust the changes of seedlings in eight areas, the changes were made several times. Third, the main points of the project 1, earthwork backfilling: as the south lake yingbin avenue (outer ring - high-speed section) greening project is interchanges, the scene very low-lying terrain, to meet the road greening landscape effect, the ministry for earthwork backfill all sections. Soil paving: because of the minimum

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档