- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
交通工程(完工图)完工说明(国外英文资料)
交通工程(竣工图)竣工说明(国外英文资料)
The plumber said
First, the general situation of the project
This project from Xiao river crossing north to early AnLin 荘, total length of 6.02 ㎞ road. The road of intersection of this design is the road of guo du south street and the villages and towns along the route. The intersection has been designed in the form of the communication industrial park, the no.1 road, the number two, the number 3 and the binhe north road, all of which are intersected by the plane.
Village or units are mainly along the alms bowl village, south village, north village, north ray ray zhang village and communication industrial park directors, hay farm, xi an university of electronic science and technology, the original Guo Du toll station officer, shaanxi vocational college, xi an mechanical and electrical technology information institute, early AnLin 荘, roadside gas stations, etc. The entry and exit of the villages and towns along the route are in line with the status quo.
The design section of this project is as follows:
Modified vehicle width 21 m, for two-way six lanes and non-motor vehicle lane width of 2 x 3 m on both sides, the lane on both sides of the machine branch of isolation pier 2 x 0.5 m, width of green 2 x 3.5 m, road planning red line width of 35 m.
Including early AnLin 荘 road transect layout for: motor vehicle width 21 m, for two-way six lanes and non-motor vehicle lane width of 2 x 3 m on both sides, the lane on both sides of the machine branch of isolation pier 2 x 0.5 m, the west side of the sidewalk 3.5 m. The eastern side of the green belt is 3.5 m. The red line of the road is 35m.
The cross-section of the bus stop is arranged: the width of the road is 13.5 m, the platform width 2m, the non-motorized driveway width 3m, the road red line is 18.5 m. The other half of the road is the same.
In the case of land requisition, the whole section of the planning road is not under construction, so some signs are not constructed (see the floor plan).
Se
您可能关注的文档
最近下载
- 2025年事业单位工勤技能-广西-广西园林绿化工四级(中级工)历年参考题典型考点含答案解析.docx VIP
- (正式版)SH∕T 3507-2024 石油化工钢结构工程施工及验收规范.pdf VIP
- 标准图集-08SG115-1-钢结构施工图参数表示方法制图规则和构造详图.pdf VIP
- 饲草种子繁育工岗位现场作业操作规程.docx VIP
- 江苏开放大学昆曲060209第二次作业.docx VIP
- 2025中国宠物医疗行业现状报告.pdf VIP
- 音乐的作用教学课件.pptx VIP
- 贵州贵酒集团有限公司污水处理厂项目环评报告.docx VIP
- 种子繁育员岗位工艺作业操作规程.docx VIP
- 奔驰M272维修手册.pdf
原创力文档


文档评论(0)