医疗污染工程:干净室的施工质量操纵(国外英文资料).docVIP

医疗污染工程:干净室的施工质量操纵(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
医疗污染工程:干净室的施工质量操纵(国外英文资料)

医疗净化工程:洁净室的施工质量控制(国外英文资料) Medical purification project: the construction quality control of the clean room In the modern medical industry, as a special and huge industry, people are almost as demanding in their health care services. Hospitals must also be professional in implementing medical purification projects. The clean room is a more important place to be in the operating room. The quality control can be divided into three stages: the preparation stage, the construction stage and the acceptance stage. (1) the key points of quality control in preparation stage Carefully prepare the drawings and the technical background Fully understand design intent, and the blue prints.the design technical clarificaiton work is to guarantee the quality of the clean room construction important link, find and solve the difficult technical problems in the construction, in order to ensure the clean room construction quality to lay a solid foundation. There will be a variety of contradictions in the construction, which require the cooperation between the construction party and the design and construction, and make reasonable changes to ensure the quality of the clean room. Such as in a clean room reconstruction project inspection found that the original design of the duct size in body building floor height restricted within the condole top layer cannot construction and after construction of coordination with design personnel and the project owner in does not affect the premise of engineering quality, the duct size from square to the sector, both meet the requirement of air volume, and ensure the construction of the ceiling height requirements. Strictly control the quality of material equipment The material equipment of clean room mainly has various adornment material and air conditioning equipment material. The decoration materials shall be inspected and verified strictly in accordance with the requirements of state relevant engineering and technical standards, construction quality

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档