- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
厂区主排水系统泄洪能力计算(国外英文资料)
厂区主排水系统泄洪能力计算(国外英文资料)
The discharge capacity of the drainage system in the factory is calculated
Our factory currently has three main drainage pipes in the factory area which are in the east drainage ditch and the south drainage ditch. The main distribution is as follows;
1, the sewage treatment station is located in DN800 reinforced concrete precast main drain pipe
Flow Q = 1 / n * omega R2/3 * I1/2 = 1/0.014 * 0.42 * 0.42 * 0.3142/3 * 0.0031/2 = 0.963 m 3 / s
= 3466.8 meters per hour
Factory district northwest edge cooling tower area, road rain drainage, circulating water pump room, network control building, water treatment and wind deflector between libraries, in 200 mw unit area production, living and main workshop of fixed end side south rain rain and desulfurization gravity to rainwater drainage pump, the pressure increase to the sewage treatment station of DN800 precast reinforced concrete pipe into the factory east hong ditch. The rainwater pump room sets up 3 WQ submersible sewage pumps with the maximum flow of 700m3 / h for each pump.
The main workshop of 100MW unit is the main workshop of the main workshop of the area, the water and desulphurization area, the electric dust removal, the production of the fan, the life and the entry of the pipe.
The main drain line of the main pipe of DN1200 reinforced concrete on the east side of the chlorine
Drainage capacity (flow Q) = 1 / n * omega R2/3 * I1/2 = 1/0.014 * 0.14 * 0.32/3 * 0.0031/2 = 1.96 m/s
= 7056 m3 / h
North of factory production office building, office building, dormitory operation, chemistry, materials department chemical factory, 7, 8 # main transformer areas of production, living and rain water into the pipe through 48 ) reinforced concrete prefabricated piping east hong ditch into the factory.
3, 1 # coal field east side, coal control building south side DN800 reinforced concrete precast main drain pipe
Drainage capacity (flow Q) = 1 / n * omega R2/3 * I1/2 = 1/0.014 * 0.42 * 0.42 * 0.3142/3 * 0
您可能关注的文档
最近下载
- 低压作业实操科目三安全隐患图片题库(10页).pdf VIP
- 2024年广西国际商务职业技术学院单招职业适应性测试试题及答案解析.docx VIP
- 2024年广西机电职业技术学院单招职业适应性测试试题及答案解析.docx VIP
- 2024-2025学年上海市杨浦区九年级上学期期中考试数学试卷含详解.docx VIP
- 出院患者随访话术培训.pptx VIP
- 2024年江西机电职业技术学院单招职业适应性测试试题及答案解析.docx VIP
- 2024年广西理工职业技术学院单招职业适应性测试试题及答案解析.docx VIP
- 中国地理空白图(政区、分省轮廓、地形铁路空白图.doc VIP
- 2025至2030中国智慧停车系统行业城市级平台建设及运营维护分析研究报告.docx
- 单基因遗传病.pptx VIP
原创力文档


文档评论(0)