基坑排水降水方案(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
基坑排水降水方案(国外英文资料)

基坑排水降水方案(国外英文资料) The Evergrande is all 29 # - 30 # The base pit row water row dirty party case Unit: zte construction co., LTD Editor: The nuclear judge: Schedule: October, 2003 7 - catalogue 1, engineering profile 1 Second, formulation basis and underground hydrological situation 1 (1) the formulation of the basis 1 (2) underground hydrologic situation 1 Third, ground water, slope and other monitoring 2 4, the technical measures for the construction of the foundation pit are 3 (1) the water in the foundation pit is 3 (2) the foundation pit drains 3 5, drainage plan 4 in the foundation pit (1) the open trench and the set of water Wells are arranged 4 (2) the preparation of mechanical equipment and personnel is 5 1, mechanical equipment 5 2, other devices 5 People make up 6 6, safety assurance measures 6 First, the general situation of the project The first floor area of the Evergrande, the first floor area of the building is 1896 square meters, and the total building area is 42,2572 square meters. The structure of the shear wall of the concrete frame of the concrete reinforced concrete frame, the main body is 24 stories, underground 3 floors. One to three layers is 4.50 meters high, the four floors are 3.20 meters high and the building is 81.1 meters high, which is a high level commercial building. The construction engineering grade level is one, the structure is aseismatic and the intensity is six degrees, the building design is reasonable to use the life span for 50 years. According to the basic survey of the engineering foundation, the base holding layer (the weathered mudstone and sandstone) is around 5-9m. The excavation of the excavation of the foundation pit of 29-30 is nearing the end of the excavation, and the owner has entrusted other specialized units to make anti-slip piles and concrete blowout protection walls around the foundation pit. Due to the owner after the conditions of the foundation pit excavation has not notice for pile foundation constructio

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档