修建工程放样(国外英文资料).doc

  1. 1、本文档共6页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
修建工程放样(国外英文资料)

建筑工程放样(国外英文资料)The condition of the school nuclear in the sampleThe results of a construction release are usually delivered immediately (or hours later) and often cant wait to check the validity of the results. This requires the sample operator to have a self-checking condition in the assignments. In a timely manner to correct. Now, this is summarized as follows:The lofting of the main axis points. Single triangle method (triangle and check), three forward intersection method (two sets of coordinate check), the trilateral ranging intersection method, etc., it is forbidden to use two angular intersection method to determine the axis point.The lofting of the outline of the project: the point at the intersection of the Angle of measurement. You have to go in three directions, in the third direction; With the point of the resection, the four known directions must be observed. Four sets of coordinates for the school nuclear condition; No matter which method is used to set the outline of the building. After the set point, the spacing of the adjacent contour points is measured and compared with the theoretical value to find the coarse difference. Adopts photoelectric ranging method of polar coordinate lofting point. If the scene just lofting a p.m. Design should also be another point layout data, on the spot and put the second point. To make the design space between two points for the school nucleus; If it is the precise lofting point of the rule graph. The geometrical relations between the set points should be inspected at the site of the construction site; When using a photoelectric rangefinder, a round trip observation is required. This is also true when using the level of a water level.Use the direction method (including polar coordinates) : when the instrument is fixed to the station, it must follow two known directions to observe the situation of the azimuth. In a simple, less accurate setting. General should do: horizontal Angle observation a check. In the case of hi

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档