- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
江苏如东25MW秸秆发电示范项目简介(演示稿)
Brief Introduction for Pilot Project of 25MW Straw-fired Power Plantin Rudong, Jiangsu, People’ s Republic of China Pilot Project of 25MW Straw-fired Power Plant in Rudong locates in the Juegang town of Rudong county of Jiangsu province. The project is consisted of a 110t/h high temperature and high pressure straw-fired drum boiler and a 25MW condensing steam turbine-generator unit. Northeast Electric Power Design Institute (NEPDI) undertakes to construct this project with EPC mode. The project began to pour the first tank of the concrete on Mar. 27, 2007 and successfully ignited the boiler on Dec. 2007. The power plant will use the straw fuel to complete the 72+24 hours commissioning. The total investment for the project is about 299 million Yuan RMB and uses 10 million US Dollars. The project is respectively invested by Jiansu Guoxin Asset Management Group Ltd (65% of investment) and Nantong Investment Management Co. Ltd. (35% of investment). Boiler fuel mainly uses soft straws, such as rice straw, wheat straw and corn straw, etc.. And feeding facility for hard straws is installed in the power plant, which is possible for using the branches, cotton straw, rice shells and peanut shells etc.. There are 23 purchasing straw stations within the boundary of Rudong county, where the biomass fuels are baled (for rice straw and wheat straw), crushed (for branches and cotton straw) and stored. When necessary, the biomass fuels will be transported into the storehouse in the power plant area. An unloading system and belt conveying system are provided in the storehouse to convey the straws into the boiler. The water supply for the circulating makeup water and service water of the power plant intakes from Jiuyao River near the site. The makeup water of the boiler uses the urban running water in winter and intakes from Jiuyao River in summer. A set of raw water pretreatment device is instal
文档评论(0)