培植工程平安临盆技巧试题2(国外英文资料).docVIP

  • 1
  • 0
  • 约7.02万字
  • 约 19页
  • 2017-06-05 发布于河南
  • 举报

培植工程平安临盆技巧试题2(国外英文资料).doc

培植工程平安临盆技巧试题2(国外英文资料)

建设工程安全生产技术试题2(国外英文资料) Technical test item 2 for construction project safety Unit: name: test no. : score: According to the standards of industry and enterprise noise in our country, all new, expanded and converted enterprises allow noise to be (C) decibels. A. the b. the c. the d. the The roof of the slope is greater than 1:2.2. The protective railings should be set (C). A. 1.1.1.1.4 m The design of the anti-slip bearing capacity of the docked is (A). A. A. B. A The elevator must have protective railings or fixed gate doors. There should be a safety net (B) in the elevator shaft. A. m b. c. c. 12m d. 14m The relative height of the mobile distribution box and switch box center to the ground can be (B) m. A. 0.8 b. C The base of the material elevator is made up of C20 concrete, and the thickness shall not be less than (A). A. 300mm B When the protective shelter is set up and dismantled, the guard area and the special peoples custody shall be set up, and the removal shall be strictly prohibited (D). A. from the carpenter c. from the top down d. up and down In the construction elevator operation button (B), non-automatic reconfiguration must be adopted. A. the push button b. the button d. the stop button The method of drainage of foundation pit is (A). A. water discharge, artificial lowering of water level b. artificial drainage c. natural drainage d. forced drainage The distance between the temporary dormitory and the kitchen and the substation should not be less than (B) m. A. 10 b. 15 c. 20 d. 25 The depth of the vibrator in the concrete should not exceed (C) when the work is done. A. 1/3 ~ 2/3 b. 1/3 ~ 1/2 c. 2/3 ~ 3/4 d. 2/3 ~ 4/5 It is commonly used (D) for the retaining wall in the height of 5m. A. the anchor is retaining the wall of the concrete C. anchor retaining wall d. gravity retaining wall The burning area is divided into (C). A. one b. two c. three d. four Temporary excavation of sand (excluding fine sand and silt) should be (D). A. 1:0.50 ~ 1:1.00 b. 1:

文档评论(0)

1亿VIP精品文档

相关文档