塔式起重机(塔吊)是如何加高的?(国外英文资料).doc

塔式起重机(塔吊)是如何加高的?(国外英文资料).doc

  1. 1、本文档共5页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
塔式起重机(塔吊)是如何加高的?(国外英文资料)

塔式起重机(塔吊)是怎样加高的?(国外英文资料) After each addition, the main string of the tower and the lower support must have a standard joint bolt connection. If the addition is no longer, the eight high-strength bolts between the lower and the standard sections must be fully connected to ensure the bolt pretension is required. ; (3) the step on the standard section must be correct with the existing standard section. (4) to ensure the safety of the pin shaft at the end of the shaft. (5) the whole process of lifting the whole process requires a special person to look at the wheel and see if there is any derailment and derailment. Disassembly standard section: The order of disassembly of tower crane is the reverse process of installation. That is: the first to be opened first, the first of the first installs. For tower crane is in commonly removal engineering basic strict working hours, some still remove after idle for a long time, equipment technical status and intact degree are likely to exist some problems, so on the preparing work before dismantling tower and tower process should be attached great importance to. On the basis of serious examination and preparation, it is only possible to make the demolition tower work after the concrete conditions of the scene. The removal of the tower should note the following points: Check carefully before (1) down the tower of the main stress components are in good condition, welding parts is normal, the bolt fastening part vice is excellent in good condition, whether the pin shaft, baffle is complete in good condition. (2) carefully check whether the electrical system is normal, sound and reliable. (3) to check whether the operation of various institutions, especially the hydraulic top lifting mechanism, is normal and its technical state is reliable. (4) turn the heavy arm back to the standard section to introduce the window, and use the device such as the rotary limiter to reliably locate. (5) to be removed and the top section of standard sect

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档