- 17
- 0
- 约1.48万字
- 约 21页
- 2017-06-08 发布于河南
- 举报
特殊路基处理方案(国外英文资料)
特殊路基处理方案(国外英文资料)
First, the general situation of the project
K285 + 000 ~ K300 + 000 section of special roadbed handles zero fill, fill and excavation roadbed, a total of 14, according to the governors office issued the subgrade drainage protection engineering design drawings (part change a ~ 5) and field survey, construction in half filling and digging up combining site geogrids. The excavation section spread the work cloth, replace the 0.8 m gravel cushion layer, the excavated section set the blind ditch, the blind drain end set the stone. The blind canal is more than 200 meters long and is
您可能关注的文档
最近下载
- 03G322-1 钢筋混凝土过梁.docx VIP
- 幼儿园教师科学素养的研究.pdf
- 广东省惠州市惠东县2023年中考二模数学试题(含答案).docx VIP
- 03G322-1 钢筋混凝土过梁.doc VIP
- 第11课《山地回忆》教学设计统编版(2024)七年级语文下册.docx VIP
- 11《山地回忆》公开课一等奖创新教案.docx VIP
- 主体结构施工方案.doc VIP
- 2026年河南交通职业技术学院单招职业倾向性测试必刷测试卷最新.docx VIP
- 2022年语文新课程标准试题语文教师招聘选调必背(含参考答案).pdf VIP
- 河北省秦皇岛市地理生物会考真题试卷(含答案).docx VIP
原创力文档

文档评论(0)