安徽省高速公路及其设施损坏(占用)补偿标准(国外英语资料)
安徽省高速公路及其设施损坏(占用)补偿标准
The anhui expressway and its facilities damage compensation standards
?
The serial number
name
specifications
unit
Unit price (RMB)
note
a
Occupy the highway
?
?
?
?
one
Occupy the land of the highway
?
㎡ / day
2.00
Less than a day
At one day
2
Take up the road and shoulder
?
㎡ / day
10.00
?
3
Wear (cross) the line
?
?
?
?
3.1
A diameter of 50 cm or less
?
m
1000.00
?
3.2
50 cm diameter
?
m
1500.00
?
The second
To occupy the highway and the compensation of the road
?
?
?
?
one
Road surface scratches
?
m
10.00
The width is less than or equal to 1cm and is less than or equal to 1cm
2
dredging
?
The m3
40.00
?
3
Dig the dirt shoulder, the ditch, the slope
?
The m3
500.00
?
4
Pollution of cement concrete road surface
?
?
?
?
4.1
Waste water, silt, and debris
?
㎡
20.00
?
4.2
Oleic acid class
?
㎡
60.00
?
4.3
Glass and iron filings
?
㎡
80.00
?
5
Asphalt concrete road pollution
?
㎡
?
?
5.1
Waste water, silt, and debris
?
㎡
20.00
?
5.2
Oleic acid class
?
㎡
200.00
?
5.3
Glass and iron filings
?
㎡
100.00
?
6
Discharging waste
?
Tons of
150.00
?
7
The land of the highway is taken from the soil
?
The m3
50.00
Less than one cubic meter per cubic meter
three
Damaged highway facilities
?
?
?
?
(a)
The road surface
?
?
?
?
one
Cement concrete pavement
?
㎡
200.00
?
2
Cement concrete pavement shrinkage
?
m
8.00
?
3
Cement concrete pavement expansion seam
?
m
25.00
?
4
Asphalt concrete pavement
?
㎡
360.00
?
(2)
Bridge surface
?
?
?
?
one
Cement concrete bridge face
?
㎡
230.00
?
2
Asphalt concrete bridge
?
㎡
370.00
?
3
The bridge expansion joint
?
m
1600.00
?
(3)
Earth shoulder and central belt
?
?
?
?
one
Dirt road shoulder
?
The m3
200.00
?
2
Retaining walls and protecting slopes
?
The m3
260.00
?
3
Stone ditches
?
The m3
260.00
?
4
The road is the stone and the water
?
m
40.00
?
5
Rapids slot
?
place
800.00
?
6
The central belt fill
?
The m3
30.00
?
(4)
Along the facilities
?
?
?
?
one
brace
?
a
143.00
?
2
Bridge anti-dazzle net
?
m
300.00
?
3
Three wave beam g
您可能关注的文档
最近下载
- 中国高尔夫差点系统会员入会申请书.doc
- 江苏国泰(002091)公司2023年财务分析研究报告.doc
- 2024执业药师继续教育药物分析(3)参考答案.docx
- DB11T 383-2023 建筑工程施工现场安全资料管理规程.docx
- 总体国家安全观授课.pptx VIP
- 一种聚4-甲基-1-戊烯中空纤维膜的制备方法.pdf VIP
- DB11T 1832.2-2023 建筑工程施工工艺规程 第2部分:防水工程.docx
- 普外科麻醉科运用PDCA循环提高患者术后自控镇痛有效率QCC品管圈成果汇报书.docx
- 海信BCD-203FH电冰箱使用说明书.pdf
- 哈工大尹海洁社会统计学(第2版)课后习题答案.docx
文档评论(0)