南方电网 配网工程 57-tsfgc-03岩石开挖作业指导书-2012-.docx

南方电网 配网工程 57-tsfgc-03岩石开挖作业指导书-2012-.docx

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
南方电网配网工程57-tsfgc-03岩石开挖作业指导书-2012-解读

第8部分:配网工程 岩?开挖作业指导书 编码:TSFGC-03 中国南方电网有限责任公司电网建设施工作业指导书 第 8 部分:配网工程 TSFGC-03 岩?开挖作业指导书  PAGE 480  PAGE 479 目次 1适用范围······················································································································································437 2编写依据······················································································································································437 3作业流程图···················································································································································437 4安全风险辨析与预控···································································································································437 5作业准备························································································································································13 6作业方法··························································································································································6 7质量控制措施及检验标准·······························································································································9 1适用范围 本节适用于35kV及以下配网工程架空线路工程的岩石基坑开挖施工。 2编写依据 表2编写依据 序号引用资料名称1GB50233—2005《110~500kV架空送电线路施工及验收规范》2GB50202—2002《建筑地基基础工程施工质量验收规范》3Q/CSG11105—2008《南方电网工程施工工艺控制规范》4《中国南方电网有限责任公司基建工程质量控制作业标准(WHS)》 3作业流程图 图3作业流程图 4安全风险辨析与预控 4.1岩?开挖作业前,施工项目部根据该项目作业任务、施工条件,参照《电网建设施工安全基准风 险指南》(下简称《指南》)开展针对性安全风险评估工作,形成该任务的风险分析表。 4.2按《指南》中与岩?开挖作业相关联的《电网建设安全施工作业票》(编码:TSFGC-03-01/01),结合 现场实际情况进行差异化分析,确定风险等级,现场技术员填写安全施工作业票,安全员审核,施工负责人签发。 4.3施工负责人核对风险控制措施,并在日站班会上对全体作业人员进行安全交底,接受交底的作业人员负责将安全措施落实到各作业任务和步骤中。 4.4安全施工作业票由施工负责人现场持有,工作内容、地点不变时可连续使用10天,超过10天须 重新办理作业票,在工作完成后上交项目部保存备查。 表4.1作业任务安全基准风险指南 序号危害名称风险种类风险等级风险控制措施 1炸药、雷管混放携带爆炸高风险炸药、雷管应分开携带 2 作业人员前后间距不足碰撞打击 低风险 确保作业人员前后间距不得小于3m 3挖掘机械回转半径范围内站人 碰撞 中等风险施工区域必须做好警示标识,挖掘机械工作期间禁止人员进入 4 引爆前,爆破区域没有彻底清场 爆炸 高风险1.引爆前,应确认爆破区域内所有人员已撤离,

文档评论(0)

dajuhyy + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档