中国建筑施工网论坛--旋扩珠盘桩旋工方案(国外英文资料).docVIP

中国建筑施工网论坛--旋扩珠盘桩旋工方案(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
中国建筑施工网论坛--旋扩珠盘桩旋工方案(国外英文资料)

中国建筑施工网论坛--旋扩珠盘桩旋工方案(国外英文资料) Rotary beading scheme Rotary beading scheme Construction sequence The orientation of the construction preparation, pay-off, pile hole pay-off, spiral drill hole formation, pile hole self-checking, spin up into dishes, clean up the pile hole, inspecting and self-checking, foundation pile hole trough, concealment acceptance, put steel reinforcement cage, concrete pouring and curing concrete, test pile, the completion of acceptance. (2) construction methods 1, construction preparation and positioning line: inspect the site of the construction and make the layout. Coordinate with the relevant units, complete the three-way work, carry out the location of the building, and make a record of checking the verification visa. To contact building materials and make materials, test and match the pre-trial work. The project owners shall arrange for the removal of the original hardened ground level. Spiral holes into holes (1) to carry out the pile-hole measuring and discharge line, and the inspection is correct. (2) the foramen shall control the size of the hole by the design and the hole depth, and the screw will be drilled into the hole and then check it in time. (3) the relevant provisions of the displacement of the pile hole must not exceed: pile foundation center line of allowable deviation of 70 mm, verticality deviation 1%, allowed the pile hole diameter deviation is allowed to 20 mm, the pile hole depth meet the design requirements. (4) the orifice is covered by a plate so as not to fall into the hole. 3, bead forming (1) based on design drawings, the hole wall elevation point locus of control, make the broaching machine into the pile hole size meets the design requirements of drawings to the first position, and make the corresponding tags in this position. (2) the position of the first set of position is taken, the position of the expanding machine to the two disk is raised, which is to satisfy the design requirement of the spacing of the dis

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档