双轮铣成槽机技巧初探(国外英文资料).docVIP

双轮铣成槽机技巧初探(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
双轮铣成槽机技巧初探(国外英文资料)

双轮铣成槽机技术初探(国外英文资料) The ground is used in combination with an impact drill or blasting. 2) it is not flexible to be restricted by the equipment, especially in phase 2 slot. 3) it is sensitive to the iron in the strata or the steel bar in the original formation. 4) equipment maintenance is complex and expensive. The equipment has a higher self-importance and more traditional equipment. The construction progress and economic comparison of 2.3 double-wheel milling and traditional construction techniques Double milling equipment construction progress with traditional scratch slot machine and punching machine in the soil, sand and other weak formation is not very obvious advantages, is about to grasp of the slot machine 2 ~ 3 times, grasp the slot machine in pore forming efficiency about 10 m3 / h, double milling groove speed the efficiency in such a formation in 20 m3 / h ~ 30 m3 / h. Once in the rock section, double milling will show its advantage, choose appropriate tools, rock in the weathering of rock (mpa) under 60, the construction efficiency can reach 10 m3 / h, in the breeze strata (mpa 60 ~ 120 mpa) can reach 1 m3 / h ~ 2 m3 / h. In the formation of grasp basic cannot use machine, punching pile machine must be used to complete, punching speed in weathered rock strata in about every 4 m to 6 m, affecting the efficiency in 0.3 m3 ~ 0.5 m3, if in the breeze in the formation drilling is extremely difficult, each affecting penetration can only stay a few centimeters, efficiency is very low. Cost: a comparative analysis on the double milling slot costs according to different stratum, about 1000 yuan/m3 ~ 1500 yuan/m3, it is normal construction technology of 1.5 ~ 2 times, no advantage in weak strata, but in the depth of diaphragm wall, high accuracy, a hard stratum lithology show advantage. The main technical points of a two-wheel milling machine 3.1 double-wheel milling cutter form Double milling into slot milling equipment wheel cutter according to the lithology of

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档