溪洛渡水电站右岸导流洞施工测量(国外英文资料).docVIP

溪洛渡水电站右岸导流洞施工测量(国外英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
溪洛渡水电站右岸导流洞施工测量(国外英文资料)

溪洛渡水电站右岸导流洞施工测量(国外英文资料) The construction of the right bank of xilodu hydropower station is measured In this paper, by leexp988 contribution Abstract: this paper briefly introduces the whole process of the construction survey of the right bank of xilodu hydropower station, and gives a detailed description of the key operation steps. In this paper, the development of the measuring operation in the right bank of the right bank of xilodu hydropower station was summarized, the new process of measuring operation and the new method of operation were presented. Keywords: xiluodu diversion tunnel construction measuring methods Introduction to the marginal resection of a project Jinshajiang xiluodu hydropower station is one of China to send the backbone of the middle line power supply in our country, in the present county of sichuan province and yunnan province yong good county at the junction of the jinsha river. Xiluodu hydropower station is a power generation is given priority to, with flood prevention, sand and improve the downstream navigation conditions, such as the huge comprehensive benefits, extra large type hydropower station with incomplete year adjustment ability. It is the first phase of the jinsha river basin implementation. The hydropower station of xilodu hydropower station consists of the concrete hyperbolic arch dam, the water generating system, the discharge flood system and the diversion building. The maximum dam of the concrete hyperbolic arch dam is 278.0 m, the top height of the dam is 610.0 m, and the arch center arc length 698.07 m. The power plant is underground, located in the left and right sides of the river, each of which has 9 single-machine capacity of 700MW water wheel generator set, the total installed capacity is 12600MW. The two sides of the construction site have three diversion tunnels, from left to right left bank to 1 # ~ 3 # and the right bank is 4 # ~ 6 #. The tunnel is arranged in a single bend, the section of the tunnel is a city g

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档