马栏河污水处理厂(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
马栏河污水处理厂(国外英文资料)

马栏河污水处理厂(国外英文资料) The horse river sewage treatment plant Ma bar river sewage treatment plant is built using world bank loan in dalian A secondary city sewage treatment plant, the French gain full company S3D + Biofor process, with A total investment of 170 million yuan (including sewage intercepting, deep discharge and land resettlement project, the project total investment is RMB 265 million yuan), service area of 32 km2, service population of 350000 people, covers an area of 4.3 hectares, design, processing capacity of 120000 tons, 40000 tons can be used as water reuse, water reach the standard level 1 A. The project in May 1992 by the planning commission approved project, in November 1993 by the world bank organization assessment, in September 1997, signed a technology contract agreement with the contractor, formally started in November 1998, the project was completed in September 2000 to enter debug run-time, debugging and running, after a year of project handover ceremony was held on August 2001, ma bar river sewage treatment plant officially handed over to dalian municipal drainage management. 1 the sewage of water quality and quantity (mainly the life sewage, also contain a small amount of industrial waste water) through the municipal pipeline closure and convergence of culvert into bar ma river sewage treatment plant, the water inflow has been more than 12 x 104 m3 / d, waterworks for full load operation. Design water quality: COD = 480mg/L, BOD5 = 216mg/L, SS = 350mg/L, NH + 4-n = 40mg/L, pH = 6 ~ 9; Water quality: COD is less than 40mg/L, BOD5 is less than 10mg/L, SS is less than 10mg/L, NH + 4-n is less than 5mg/L, pH = 6 ~ 9. Process flow and main structure Bar ma river sewage treatment plant of primary treatment used SEDI PAC 3 d (hereinafter referred to as S3D) technology, secondary treatment adopted by BIO FOR C/N and BIOFOR secondary filtration system composed of N. The detailed process flow is shown in figure 1. (1) pretreatment Raw water after asce

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档