20121012系统集成项目管理工程师总结(国外英文资料).doc

20121012系统集成项目管理工程师总结(国外英文资料).doc

  1. 1、本文档共26页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
20121012系统集成项目管理工程师总结(国外英文资料)

20121012系统集成项目管理工程师总结(国外英文资料) The project software configuration management process: Establish and maintain configuration management organization guidelines. Develop the project configuration management plan. Determine the configuration identity rule. Implement change control. Report configuration status. Conduct configuration auditing. Versioning and distribution management. Configuration management consists of several activities The configuration manages the hardware and hardware resources, the configuration items plan, the baseline plan, the delivery plan, the backup plan, the configuration audit and the review, the change management Baseline configuration items including all the design documents and the source program, all configuration items operation permissions by CMO configuration managers should be strict management, as the basic principles of configuration items of operating rights management, baseline configuration items to software developers read permissions, the baseline configuration items open to PM, CCB and related personnel The basic structure of the project configuration management system: Development libraries (dynamic systems, development systems, workspace) : the information that needs to be kept in the development process for personal use by developers A controlled library (main library, primary system) : when a certain phase of the information system development is completed, the work product is stored or stored in the information. Literacy and modification of information need to be controlled. The product library (backup library, static system) : after the system test, the final product is stored in the library, waiting to be delivered to the user or the site installation. The specification of a controlled library and a product library enables the management of configuration items. Project scope management Detailed project scope statement should include the goals of the project, the scope of the project description, project deliverables, the

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档