- 1、本文档共15页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
模拟施工问题(国外英文资料)
模拟施工问题(国外英文资料)
Constant load calculation information:
1: one-time load calculation: mainly used for multilayer structures, and it is best to use this loading calculation method for multi-layer structures. Because the layers of the construction have a small effect on the vertical deflection of the multi-layer structure, do not use analog construction method.
2: simulate construction method 1 load: it is the normal simulation construction method load, the high-level structure, generally adopted this method computation. But for the frame shear structure, adopting this method on the basis of the guide to the internal force of shear wall under internal force particularly big, make the foundation underneath is difficult to design. And then you have the next vertical load method.
3: load simulation method 2: this is the basis of simulation method 1 general the vertical component, column, wall) increase the stiffness of 10 times for structural internal force calculation, which is then simulated loading is calculated under the condition of the construction method 1. By using this method, the force that is calculated from the base is more uniform and reasonable, which can avoid the axial force of the wall far greater than the axial force of the column. Due to the vertical component of stiffness amplification, making the level difference of vertical displacement at the ends of the beam to reduce, thus reduces the shear force, thus weakened the floor load caused by uneven stiffness and internal force redistribution, so this method is more close to the manual calculation.
But I think this method artificially enlarges the line stiffness ratio of the vertical component to the horizontal component, so it is worth exploring the calculation. So, expert advice: use simulation method 1 when performing upper structure calculation; In the base calculation, the calculation result of simulated construction method 2 is used. The basic result is reasonable. (high-rise building)
Reference: /b
您可能关注的文档
- 怎样用DNS解析域名(国外英文资料).doc
- 微机期末(国外英文资料).doc
- 怪物猎人p3技能说明(国外英文资料).doc
- 恢复SQL2000数据库远程连接显示多个实例(国外英文资料).doc
- 惠普笔记本电脑保养大全-看了不后悔(国外英文资料).doc
- 惠普打印机通用报错代码(国外英文资料).doc
- 感光胶的分类介绍(国外英文资料).doc
- 意大利建筑杂志《Domus》(国外英文资料).doc
- 我整理的USB2.0协议中文版(国外英文资料).doc
- 我的第一个C# 程序《计算器》的文件Form1.Designer.cs(国外英文资料).doc
- 中国科学院理化技术研究所杭州研究院胶原基生物医用材料研发平台技术改造项目环评报告.docx
- 浙江省第六监狱警察备勤用房改建项目环评报告.docx
- 浙江和诚滨奥汽车有限公司建设项目环评报告.docx
- 杭州乌托邦娱乐有限公司建设项目环评报告.doc
- 2021年6月19日浙江省宁波大学事业编制招聘(综合岗)考试精选题(解析).pdf
- 2019年下半年浙江省事业单位考试《职业能力倾向测验》真题(解析).pdf
- 2019年浙江省上半年事业单位联考《职业能力倾向测验》(解析).pdf
- 2021年5月22日浙江省宁波市海曙区事业单位招聘考试《综合知识》(解析).pdf
- 2019年11月23日浙江省宁波(余姚、宁海、象山统考)《综合基础知识》(上午)(解析).pdf
- 2020年1月4日浙江省宁波市北仑区(开发区)公开招聘事业单位笔试(精选)(解析).pdf
文档评论(0)