2014东财《工程项目管理》在线作业三(外国英文资料).docVIP

2014东财《工程项目管理》在线作业三(外国英文资料).doc

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
2014东财《工程项目管理》在线作业三(外国英文资料)

2014东财《工程项目管理》在线作业三(国外英文资料) Dong caixin project management online assignment 3 Test scores: 100 test time: - test scores: 100 One, single topic (total five questions, 20 points). Score: 20 1. Engineering construction ____ refers to the management activities throughout the project implementation stage, makes every effort to make the project on the premise of meet the quality and schedule requirements, actual investment shall not exceed the plan implementation projects Investment control Schedule control Quality control Construction control Answer: A, 4 points: 4 (2) it is an organization established by several construction enterprises for the construction of a project. A. construction consortium B. construction cooperation C. construction crews Answer: A, 4 points: 4 The management of the entire project is managed by the () center. A. the owner B. the contractor Consulting engineer D. consumers Answer: C 4 points: 4 In the course of the application for the qualification of the procuratorial agency for the first class project, it is required to have more than 30 million yuan () of the amount of projects within 3 years 5 A. 8 B. 10 C. D. 12 Answer: C 4 points: 4 5. The engineering measures for the management of bidding and tendering, tenderer who adopts the invitational tender method shall be submitted to the () more conform to the qualifications of construction enterprises send out an invitation for submission of bid. 3 A. 4 B. 5 C. 6 D. Answer: A, 4 points: 4 Two, multiple-choice (20 questions, 80 minutes). Score: 80 Opportunity research is divided into ____ A. general opportunity research B. specific opportunity research C. preliminary feasibility study Feasibility study Answer: AB 4 points: 4 The main task of project plan management () A. in accordance with the relevant national laws and policies, through the market forecast and feasibility study, the overall target, target conforms to the national economic development project and get good economic benefit, social

文档评论(0)

jgx3536 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:6111134150000003

1亿VIP精品文档

相关文档