08和13定额对比(国外英文资料).doc

  1. 1、本文档共25页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
08和13定额对比(国外英文资料)

08和13定额对比(国外英文资料) Construction valuation quota The first chapter A earthwork (note 2013 change) First, the artificial soil (stone). 1, sixth: artificial dig hole pile quota, suitable for the construction in security conditions; (2013 quota increase) 2, eighth: artificial dig hole pile, pile in vertical transportation by way of artificial consideration. If the depth is more than 12M, less than 16m within the 12m project according to the artificial amount multiplied by the coefficient multiplied by the coefficient 1.5 calculation 1.3,20m. In the same hole soil type is not at the same time, according to the fixed weighted calculation, if there is a flowing sand and mud, further processing. (2013 quota increase) Two, mechanical earth 1, Fourth: need artificial auxiliary excavation in excavation machinery (including dressing, bottom masonry slope) of the project, calculated according to the construction organization design approved by 15C thickness, M thickness calculation without artificial excavation construction organization design, the implementation of the corresponding quota project by a factor of 2 (2013 of quota increase); 2, fifth: mechanical excavation of soil between piles, according to the actual excavation volume (excluding pile volume size), the corresponding item multiplied by a factor of 1.50; (2013 quota increase) 3, tenth: loader, loader installed silt soil project execution by a factor of 1.50 sand flow; (2013 quota increase) 4, eleventh: the mechanical operation, perform mechanical transport of silt and sand flow coefficient of 1.50 multiplied by the corresponding project. (2013 quota increase) The second chapter B foundation treatment and slope supporting project (2013 change) A mechanical replacement, foundation soil, soil and sand into preparation. (2013 quota increase) Two, according to the 400T.M maximum foundation compaction compaction machinery system, more than a fixed range, measured separately added. (2013 quota increase) Five, soil anchor:

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档