- 6
- 0
- 约 28页
- 2017-06-12 发布于河南
- 举报
二级建造师考试管理实务知识点汇总(国外英文资料)
二级建造师考试管理实务知识点汇总(国外英文资料)
Economic security measures:
1. to ensure the safety of funds necessary for the production
2. to ensure that the required security facilities in the capital
3. ensure labor protection supplies, safety training funds needed
4. ensure social work-related injury insurance funds needed
The responsibility for the quality of the design unit is:
1. scientific design responsibility
2. choice of materials and equipment responsibility
3. explain the design documents of responsibility
Analysis of 4. quality accident liability
A safety warning signs in the layout, should be banned, warnings, instructions, tips of the order, the first left and right, after the first.
The sign distance should be at least 0.2 times the size of the sign
For the 2. fire approval procedures:
The first level of hot work by the person responsible for the project organization of fire safety technical scheme, hot fill in the application form, the approval of enterprise safety management review, can fire.
The two grade hot work by the project engineer to formulate safety technical measures for fire, hot fill in the application form, and submit the project safety management department and the person in charge of the project examination and approval, can fire.
The three grade hot work unit by hot fill in the application form, approved by the responsible engineer and project safety management department after examination can fire.
The permit valid on the day, such as the change of fire location, you need to apply for approval of hot work procedures.
3. temporary wood processing workshop, paint operation room, every 25 square meters should be a suitable fire extinguisher configuration types.
The 1. main causes of the accident: no special care the cylinder stores, store room door unlocked, trespassing. The gas storage room does not set the security warning signs ban fireworks.
2. no sign is used to prohibit people from unsafe behavior logo. The basic form of the circular frame with red
您可能关注的文档
- 世界现代前期科技史二(国外英文资料).doc
- 世界英雄完美版出招表(国外英文资料).doc
- 世界知名的食品企业(国外英文资料).doc
- 世界著名的女性摄影师介绍(国外英文资料).doc
- 世界风景名胜纵览之古巴(国外英文资料).doc
- 丙烯酸精制工艺流程(国外英文资料).doc
- 丛文俊先生谈篆隶书学习(国外英文资料).doc
- 东北大学15春学期《计算机基础》在线作业3(国外英文资料).doc
- 东南亚风味(国外英文资料).doc
- 东师《世界古代史(上)2013春第一次在线作业(国外英文资料).doc
- 全过程工程管理造价咨询工程监理项目服务方案投标方案(技术部分).doc
- 招标代理服务投标技术服务方案(技术方案).doc
- AI大模型与AIGC技术在公安领域的应用解决方案(99页 PPT).pptx
- 工业4.0智能制造数字工厂规划方案.pptx
- 树立社会主义核心价值观.docx
- 三年(2023-2025)中考历史真题分类汇编(全国)专题21 科技文化与社会生活(解析版).docx
- 2025年中考道德与法治真题完全解读(吉林卷).pdf
- 2025年中考道德与法治真题完全解读(安徽卷).pdf
- 三年(2023-2025)中考历史真题分类汇编(全国)专题14 人民解放战争(解析版).pdf
- 三年(2023-2025)广东中考历史真题分类汇编:专题03 中国近代史(八年级上册)(解析版).docx
最近下载
- 胆囊结石伴急性胆囊炎护理查房.pptx VIP
- 阿法拉伐分油机中文说明Instruction book.pdf VIP
- 山东省青岛胶州市、黄岛区、平度区、李沧区2024-2025学年九年级化学第一学期期末学业水平测试试题.doc VIP
- 石灰石-石灰乳二段中和法处理矿山酸性废水.pdf VIP
- 商业航天-行业报告:商业航天方兴未艾,低轨卫星星座建设加速.pdf VIP
- 华帝家用供热水燃气快速热水器JSQ24-i12047-13 JSQ30-i12047-16 JSQ24-i12048-13 JSQ30-i12048-16说明书用户手册.pdf
- CECS 364-2014 建筑燃气安全应用技术导则.pdf VIP
- 胆囊结石伴胆囊炎病例讨论.pptx VIP
- 2023版《马原》统一课件:专题四 唯物史观.pptx VIP
- 四川长江担保集团有限公司及其子公司2025年第六批员工公开招聘的备考题库及参考答案详解一套.docx VIP
原创力文档

文档评论(0)