二级建造师考试管理实务知识点汇总(国外英文资料).doc

二级建造师考试管理实务知识点汇总(国外英文资料).doc

  1. 1、本文档共28页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
二级建造师考试管理实务知识点汇总(国外英文资料)

二级建造师考试管理实务知识点汇总(国外英文资料) Economic security measures: 1. to ensure the safety of funds necessary for the production 2. to ensure that the required security facilities in the capital 3. ensure labor protection supplies, safety training funds needed 4. ensure social work-related injury insurance funds needed The responsibility for the quality of the design unit is: 1. scientific design responsibility 2. choice of materials and equipment responsibility 3. explain the design documents of responsibility Analysis of 4. quality accident liability A safety warning signs in the layout, should be banned, warnings, instructions, tips of the order, the first left and right, after the first. The sign distance should be at least 0.2 times the size of the sign For the 2. fire approval procedures: The first level of hot work by the person responsible for the project organization of fire safety technical scheme, hot fill in the application form, the approval of enterprise safety management review, can fire. The two grade hot work by the project engineer to formulate safety technical measures for fire, hot fill in the application form, and submit the project safety management department and the person in charge of the project examination and approval, can fire. The three grade hot work unit by hot fill in the application form, approved by the responsible engineer and project safety management department after examination can fire. The permit valid on the day, such as the change of fire location, you need to apply for approval of hot work procedures. 3. temporary wood processing workshop, paint operation room, every 25 square meters should be a suitable fire extinguisher configuration types. The 1. main causes of the accident: no special care the cylinder stores, store room door unlocked, trespassing. The gas storage room does not set the security warning signs ban fireworks. 2. no sign is used to prohibit people from unsafe behavior logo. The basic form of the circular frame with red

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档