城市热力管道施工(国外英文资料).docVIP

  1. 1、本文档共22页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  5. 5、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  6. 6、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  7. 7、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  8. 8、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
城市热力管道施工(国外英文资料)

城市热力管道施工(国外英文资料) In the high school Construction of 2K315020 urban thermal pipeline Construction of 2k315020 urban thermal pipeline 2k315021 master urban thermal pipe construction requirements Engineering survey Line survey shall be consistent with: The main line, trunk line and branch line should be carried out. In the pipeline, fixed bracket, building on the ground, examination room, compensator, valves in the pipeline location, measure with ruler position method. Two 、 civil engineering The excavation of the earthwork must be provided with the trench side guardrail, the night light, the red light and other facilities according to the relevant provisions, and temporary roads and bridges shall be set up as required. Three, welding 2. butt joints with unequal wall thickness shall comply with the following provisions: (1) if the outer diameter is equal or the inner diameter is equal, the thickness of the piece is less than or equal to 4mm, and the thickness difference is greater than 3mm, and the thickness of the piece is greater than 4mm, and the thickness difference is greater than 30% or more than the thickness of the thin part, the thickness should be thinned. (2) when the diameter of the inner diameter and the outside diameter are unequal, and the thickness of the single side exceeds the value listed in the 1 paragraph of this article, the thickness of the pipe wall shall be thinned at one end, and the thickness at the interface after the thinning shall be uniform. 4. when welding below zero, the weldment should be preheated in the range of 50mm on both sides of the weld. 6. unqualified welding parts, should take measures to repair, the same part of the welding repair frequency shall not exceed 2 times. Four 、 piping installation and inspection 3. butt joint shall comply with the provisions 1. when docking the pipe mouth, the straightness of the pipe shall be checked and measured at 200mm from the interface center. The allowable deviation is LMM, and the maximum

您可能关注的文档

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档