实习时间 2010年10月25日~11月5日(国外英文资料).doc

实习时间 2010年10月25日~11月5日(国外英文资料).doc

  1. 1、本文档共15页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
实习时间 2010年10月25日~11月5日(国外英文资料)

实习时间 2010年10月25日~11月5日(国外英文资料) A? The internship will be held from October 25 to November 5, 2010 The second? Internship purpose: Production practice is an important practice in the student university. Internship is a compulsory course for each of the graduates will, it not only makes us learned a lot in the classroom dont learn the knowledge, also make us widened the field of vision, and increase of knowledge, for our better after the application of learned knowledge to practical work to lay a solid foundation. Through production practice makes me more deeply contact with professional knowledge, the further understanding of the environmental protection work, understand the problems that exist in the process of environmental governance and the theory and practical difficulties in conflict, and by writing practice report, I learn to integrated application of knowledge, improve the ability to analyze and solve major problems. The internship: The NO. 1 Internship: October 27, 2010 Location: the water purification plant in beijiao, baotou city An overview of the sewage plant Suburb of baotou city water purification plant of baotou city is the largest existing sewage treatment plant, the former north sewage treatment plant expansion, in November 2000 formally put into operation, in the northern suburb of baotou baotou city water purification plant is the first secondary processing level construction operation of urban sewage treatment plant, the scale of design for day 70000 m3, sewage treatment, water in the processing of 45000 m3. The sewage with traditional activated sludge treatment process, the enrichment - screw filter sludge dewatering process, water treatment in the precipitation - filtration and disinfection technology. 2 process flow: Main structures and their functions A. grille It is used to remove the heavy floating or floating debris in the sewage, so as to protect the subsequent treatment facilities from wear or blockage. B. match well The effect is to bal

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档