- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
施工组织方案设计(国外英文资料)
施工组织方案设计(国外英文资料)
This article is contributed by ywbguan
DOC documents may experience poor browsing on the WAP side. It is recommended that you first select TXT, or download the source file to the local view.
Four, the construction organization design and installation, commissioning, acceptance plan
1, comprehensive description
1. project name: Xinghua chushui stadium 2. construction scope: standard quality sound system engineering: 3. qualified 4. construction period: 12 days (calendar days) Note: after the completion of the tender, the tender according to the project requirements set concrete construction schedule.
2, safety, civilized construction, guarantee measures, safety,
1. safety management objectives and civilized construction management objectives (1) safety management objectives: no casualties, major equipment and fire accidents. (2) civilization management objective: to promote the modern management science, organization construction, the 2. do on-site management. Safe and civilized construction is fully responsible for the safe and civilized construction management mechanism run the program and manage the project by project manager; safety education, safety inspection by the project manager, full-time security officer is responsible for the construction team; safe and civilized construction management measures implemented by the foreman, and set up a part-time safety officer. 3 measures to ensure the safe and civilized construction (1) the security assurance measures conscientiously the implementation of the security regulations. The different levels of management, division of labor, division of responsibility, prevention of various types of cases, to prevent the emergence of serious incidents; construction personnel, full-time security The whole staff carries on the security education; the on-site warehouse implements the twenty-four hour duty system; enlarges the staffs legal propaganda, the education dynamics, and regularly holds the security inspect