- 1、本文档共16页,可阅读全部内容。
- 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
- 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
汕头市中考满分作文-无题(国外英文资料)
汕头市中考满分作文-无题(国外英文资料)
The template construction, the workers should first be familiar with the drawings, and the beam plate according to the drawings, review content change up. The post pouring belt and the construction joint shall be carried out according to the standard. After the combination of the die, the number shall be piled up and the formwork shall be laid by numbering. The basic construction process of the project is as follows: the base plate, the foundation, the back beam, the underground, the two layer wall column, the ground layer, the beam slab, the ground wall, the column and the roof of the basement.
(1) the basic principles of template design;
Ensure the smoothness and rigidity of the formwork to ensure the whole effect after the concrete is released.
Adopting standardized, integrated and tool oriented templates to improve work efficiency and shorten construction period.
(two) supply and deployment of formwork material;
The carpenter turn like staff turnover, and submit the completed template layout template (steel pipe, wood material list Zhou Fang), Zhou material list after the project material supply department responsible for the audit. By the project department according to the progress of each unit, batch entry, unified deployment. Set up strict material management system, and make saving measures to reduce material loss.
The basement of this project is partly made of civil air defence basement, and some of the indoor shear walls are explosion proof walls, all of which have air tightness requirements and civil air defense requirements. On the external shear wall and column wall reinforcement 12 civil air defense pull screw should be waterproof treatment for indoor wall column, phi, pull screw only limit plate, can seal plate do not need to pull screw.
To pull the screw set reinforcement shear wall template basement, according to the construction of the concrete lateral pressure calculation, pull screw should be set up according to the secret M
您可能关注的文档
最近下载
- DELIXI德力西仪表JKL5CV JKL2CV智能无功功率自动补偿控制器使用说明书 物料号:A0463099500.pdf
- 道路亮化工程项目可行性研究报告.docx
- 幼儿园必备《师德师风培训》-2024鲜版.ppt
- 新北师大版四年级数学上册《认识更大的数》练习题.pdf
- 【西南大学】[机考][0087]《计算机网络》 (3)辅导资料.doc VIP
- 四川327省考行测真题及解析.doc
- (冀教版)八年级生物下册全教案.pdf VIP
- 广东省汕头市2022-2023学年高一下学期期末考试历史试题(解析版).docx
- 专题 事件类记叙文(记叙文阅读)(原卷版).doc VIP
- 颜料红177的制备工艺分析-analysis of preparation technology of pigment red 177.docx
文档评论(0)