有关油井的英语表达(国外英文资料).doc

  1. 1、本文档共11页,可阅读全部内容。
  2. 2、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。
  3. 3、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  4. 4、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
查看更多
有关油井的英语表达(国外英文资料)

有关油井的英语表达(国外英文资料) The first rig (drilling rig) (drill string) by drilling the drill bit (drill bit) 127-914.4 mm drilled hole in the ground (hole), and then in the middle hole (borehole) steel tubing (steel tubing) and the casing (casing). Cement (cement) may also be used to fix between the casing and the borehole. The casing provides structural integrity (structural, integrity) for the well bore (wellbore) and simultaneously isolates (isolate) the dangerous high pressure zone (high, pressure, zone). As the well depth increases, the size of the drill and bushing becomes smaller. Todays wells usually have 2-5 smaller wellhead sizes. The drill is drilled into the rock by means of a drilling collar (drill, collar) attached to it. Drilling fluid (drilling fluid/mud) (drill pipe) through the drill pipe internal pump drill, including cooling effect (cooling), enhance the drill cuttings (drill, cuttings) (wellbore wall) to avoid borehole instability and avoid rock due to the pressure of liquid into the wellbore. The used drilling fluid is removed by vibrating screen (shaker) and returned to the mud tank (PIT) after recycling. Increase the drilling depth by adding an additional 10 meter long drill stem (joints) to the top drive (topdrive/kelly, drive) of the ground. This process is called making a connection. The three drill pipe is called a vertical root or upright post (stand). The small rig uses two vertical roots, and the larger one uses four vertical roots. After drilling and casing removal, completion must be done so that oil or gas can be produced. In the casing completion (cased-hole completion), in the bottom of the oil well production area (production zone) to (perforation), perforation (crude oil) that crude oil can from the surrounding rock into the tubing. In completion (open-hole), screen (sand) or gravel filling (gravel, pack) shall be installed in the no casing reservoir (reservoir) section. After the path (flow) is completed, acids and and fluids (fracturi

文档评论(0)

f8r9t5c + 关注
实名认证
内容提供者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档