重庆涪陵长江大桥(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
重庆涪陵长江大桥(国外英文资料)

重庆涪陵长江大桥(国外英文资料) The fuling Yangtze river bridge connects fuling jiangbei yellow flag and tianzi temple. The fuling Yangtze river bridge was started in November 1994 and completed in May 1997. The fuling Yangtze river bridge is a large bridge over the Yangtze river in fuling area. Fuling Yangtze river bridge is a twin towers ShuangSuoMian PC girder cable-stayed bridge, pour the main tower height of 163 m, Y span arrangement for 43 + 97 + 330 + 97 + 43 m, bridge span 631 meters, 330 meters mainspan, bridge 18 meters wide, 4 lane, 5.3 kilometers long, the bridge is 163 meters high. The fuling Yangtze river bridge will span 330 meters. The main beam adopts the prestressed reinforced concrete double longitudinal slab section (figure 1). The beam is 2.3 m thick and 25cm thick. The bridge is 2 bidirectional cross slope, and the whole bridge is 3 ‰ of the vertical slope. The top of the beam is 21.2 m wide and the bottom is wide 22. Im. The main beam adopts the distance of the number 50, the height of the high marks, the distance between the concrete and the bar, the longitudinal and transverse prestressed beams and the cable-stayed anchor box. The entire bridge has a horseshoe across from 0.6 m. It is 25cm thick. The standard piece of the main beam is one section per 3m, weighing 22 0 tons. Starting from the sota, the middle span 2 -27, and 2, All of them are standard pieces. The remaining zeros, I, I, pieces of the beam, and the edges of the beam are non-standard pieces. The height of the main beam is greater than 9.609, and the height span is 1 / : 43.478, and the span is 14.93 三角架包括主纵梁(截面1.0m×Oo5m,6=22ram),前横梁、后横梁,后锚梁(均由 2[45a组成)、立柱(由2 E 40组成)、斜拉带,吊带,吊杆等。行走系统由主行走系统(滑 遣、滑板 圆钢蕊),前吊杆行走系统(车轮,轴承,轮轴等)及挂梁行走系统组成。底平 台包括下横梁(截面0.5m x 0.25m,b=22ram),后下横梁(截面0.5m×0.25m,6=22mm)。 底纵梁(由2[36a组成)以及加劲桁等。模板支架全部焊接,以增强整体性。内模采用组台 钢模拼装,异形地方用自己加工的钢模或术模拼装 前端模板和侧模与顶模分开,以便拆 模。 为保证挂蓝具有足够刚度,主要受力构件纵梁均采用钢板焊接成箱形断面,横梁和立柱 用钢板与型钢联接而成。同时,为增加稳定性,在两立柱间加设两片加劲桁,在主纵梁之问 设置三遭加劲桁。山于后横粱处于斜拉索后面,为移动挂篮方便,其吊杆行走系统由挂粱受 力

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档