隧道施工方案(国外英文资料).docVIP

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
隧道施工方案(国外英文资料)

隧道施工方案(国外英文资料) Two, construction plan Type II surrounding rock Rock by bench method, the construction sequence for excavation of upper half of the arc heading to the initial section supporting and excavation of core soil, excavation section, section of initial support. The upper part of the arc heading excavation section size is 2.0m, in order to facilitate the initial support of the operation, at the same time to face rock steady, annular footage of not more than 1 meters, using a hand-held air gun drilling and excavation, the wet shotcrete, the construction boom spraying machine, self unloading truck platform supporting construction, the upper half section the construction steps: The hand-held pneumatic drill drill. The upper arc part hole, drilling depth of 1.7m, the excavation footage is about 1.5m. Construction sequence of semi excavation of type II surrounding rock (hint) 2. Blasting explosives: select RJ series of emulsion explosives with 35mm diameter, drug driving eye rolls, light eyes with 25mm diameter cartridage burst, tophole used car platform charge. The explosive eye is made of interval charge, and the plastic nonel tube and non electric detonation system are used in the detonation. We are looking for top exhaust. Manual cleaning hole slag, sorting out the initial support of working face. The first injection of sprayed concrete. The unloading loader. With large tonnage dump truck mucking with side dress. 6. The installation of steel arch, a steel frame should be as close as possible to the face with steel, each internode connected by bolts, between two rows of steel frame with longitudinal reinforcement connection steel frame is erected by the car platform with electric hoists. The steel frame at the bottom of the cross section is made of 2 22mm lock bolts, and the length is 3.5m. 7. Drilling charge excavation section of core soil. 8. Unloading loader with large tonnage dump truck mucking with side dress. Only 3-4 cycles for lag. Second times will be

文档评论(0)

f8r9t5c + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

版权声明书
用户编号:8000054077000003

1亿VIP精品文档

相关文档