- 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
- 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载。
- 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
- 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
- 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们。
- 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
- 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
黄金递延业务AU(TD)风险问答(国外英语资料)
黄金递延业务AU(T+D)风险问答(国外英文资料)
1, Chinas gold trading market includes (A)
Dalian commodity exchange A Shanghai gold exchange and the Shanghai futures exchange B Shanghai gold exchange and Chinese financial futures exchange C and Shanghai Huatong platinum silver market D Zhengzhou commodity exchange and Shanghai Gold Exchange
22008 years, the highest price of domestic gold is about (B)
A 2240 yuan / gram, B 224 yuan / gram, C 22.4 yuan / gram, D 2.24 yuan / gram; yuan / gram
3 how many tons of gold output in China in 2008 (C)?
A 2.76 tons, B 27.6 tons, C 276 tons, D 2760 tons
4 which of the following is the highest risk of gold investment (D)?
A bank paper, gold, B, bullion, C, Shanghai gold exchange, AU (T+D), D, gold futures
How much is 5 ounces of gold per gram (B)?
A 28.2921, B 31.1035, C 17.8526, D 56.2347
6, the price of gold is generally related to the dollar price (B)
A positive correlation, B negative correlation, C, sometimes related, sometimes unrelated, D irrelevant
7 Shanghai gold exchange night market time is (D)
A, 20:00-21:00, B, 19:00-19:30, C, 23:40-1:20, D, 20:50-2:30
8 AU (T+D) trading unit is (B)
A 500 g / hand B 1000 g / hand C 1500 g / hand D 2000 g / hand
9 AU (T+D) margin is contract value (C)
A 1%, B 2%, C 20%, D 50%
The deferred rate of 10 AU (T+N1) is (A)
A 1%, B 2%, C 5%, D 10%
11 AU (T+D) daily price maximum fluctuation limit (C)
A shall not exceed the closing price of the last trading day of 0.7% B, not exceeding the last days closing price of + 1.7% C, not more than the last days closing price of 7% D, not more than the last days closing price of + 70%
12 AU (T+D) liquidated damages ratio (D)
A contract value of 0.8% B contract value of 1.8%, C contract value of 8.8%, D contract value of 8%
13 the deferred trading contract at the Shanghai gold exchange includes (A)
A Au (T+D), Au (T+N1), Au (T+N2) and Ag (T+D) B Au (T+D), and Pt (T+D) C Ag (T+D), Ag (T+N1), Ag (T+N2) and Au (T+D) D Pt (T+D), Pt (T+N1), Pt (T+N2) and Ag (T+D)
14 AU (T+N1) de
您可能关注的文档
最近下载
- 神经系统的分级调节ppt课件.pptx VIP
- AI测试练习试题及答案.doc
- 2025广西南宁江南区“点对点”送工和乡村公岗专管员招聘2人备考练习题库及答案解析.docx VIP
- 肿瘤防治策略与最新进展.docx VIP
- 第五章植物-病原互作过程中效应子的作用.ppt VIP
- 湘科版《科学》四年级上册全册教案.doc VIP
- IEC_62893-4-1-2020 额定电压不超过 0.61 KV 的电动汽车充电电缆 – 第 4-1 部分:符合 IEC 61851‑‑1 模式 4 的直流充电电缆 – 不使用热管理系统的直流充电.pdf VIP
- 机器人集成解决方案 (机器人+).pdf VIP
- 消除艾滋病、梅毒和乙肝母婴传播项目工作制度及流程(模板).pdf
- 2025广西南宁市江南区“点对点”送工和乡村公岗专管员招聘考试备考试题及答案解析.docx VIP
文档评论(0)