(2)The stage of formal acceptance
1)The formal acceptance is divided into two stages and include single item acceptance and all check and accept.
The 1 H420153 finishes construction the contents of acceptance
Two, finish construction before checking and accepting beard completion of acceptance item
(A)Hand over work acceptance
1.construction engineering items handing over work acceptance should meet the following rules:
(1)Constucting the unit has already pressed the examining of the engineering contracted completion engineering balanced of accounts, and sign to settle accounts a document.
(2
您可能关注的文档
- MBA各类型说文范文.ppt
- 7.电子材料学大纲.doc
- 应用化学专业----- 科技期刊检索.ppt
- 8第八章——易磋商和合同订立.ppt
- 第12章靶向剂3.ppt
- 商务英语翻译习.ppt
- 第四章 食的冻藏.pdf
- 工程造价本科养方案.doc
- 设计洪水特大处理.ppt
- 福建省信息网安全知识普及教育网络培训试卷与答案.ppt
- 专项十三 复合句(含答案) 2026年中考人教版英语语法专项复习.doc.docx
- 专项十四 There be句型和主谓一致(含答案) 2026年中考人教版英语语法专项复习.doc.docx
- 专项14 构词法 学案(含答案)2025年中考人教版英语语法专项复习.doc.docx
- 静脉肾盂造影结石梗阻评估.ppt
- 《假期实践活动》教案-2025-2026学年冀教版(新教材)小学数学二年级下册.docx
- 老年结石病合并慢病综合诊疗.ppt
- 鹿角形肾结石复杂手术治疗.ppt
- 经皮肾镜超声碎石清石术.ppt
- 《参观爱国主义教育基地》教案-2025-2026学年冀教版(新教材)小学数学二年级下册.docx
- 《生活中的大数:整理与复习》教案(2课时)-2025-2026学年冀教版(新教材)小学数学二年级下册.docx
原创力文档

文档评论(0)