Phase 3 is the tower and SE residential tower and podium to complete the south block. * The area in grey indicates the KPF schematic design scope * The area in grey, KPF would do DD * For the tower, the ballroom component, the villas and the clubs, KPF would do the construction documents * The tower. Virtually the entire tower has access to the view of the water * It is made up of office, hotel and service apartments. Each of the program elements is configured to its ideal and most efficient configuration and to capture the view. The office is a center core point tower of 20 floors. I
您可能关注的文档
- 深圳市宝安中心区商务办公区和核心商业区城市设计_(阿特金斯)介绍.ppt
- 深圳市城市更新办法细则介绍.ppt
- 深圳市建设工程电子招标投标系统培训介绍.ppt
- 深圳市酒店照明调研介绍.ppt
- 深圳湾一号_展示服务演绎与价值提升介绍.ppt
- 数字化校园建设专题介绍.ppt
- 深圳振业城项目二期营销策略介绍.ppt
- 深圳职业技术学院介绍.ppt
- 深圳中美基因院有限公司介绍.ppt
- 数字绘图技术教学介绍.ppt
- 研发部战略实施计划书.pdf
- 研发部年度工作计划.pdf
- 2026年开封市龙亭区社区工作者招聘笔试备考题库及答案解析.docx
- 2026年贵州省毕节市社区工作者招聘笔试备考题库及答案解析.docx
- 2026年浙江省杭州市中小学教师招聘考试备考试题及答案解析.docx
- 2026年江西省萍乡市中小学教师招聘考试参考试题及答案解析.docx
- 2026年咸阳市秦都区中小学教师招聘考试备考试题及答案解析.docx
- 2026年江苏省淮安市中小学教师招聘考试参考试题及答案解析.docx
- 2026年双鸭山市尖山区社区工作者招聘笔试备考题库及答案解析.docx
- 2026年山东省中小学教师招聘考试参考试题及答案解析.docx
原创力文档

文档评论(0)