大型多项目援建工程的特点分析与其管理实践.pdfVIP

大型多项目援建工程的特点分析与其管理实践.pdf

  1. 1、原创力文档(book118)网站文档一经付费(服务费),不意味着购买了该文档的版权,仅供个人/单位学习、研究之用,不得用于商业用途,未经授权,严禁复制、发行、汇编、翻译或者网络传播等,侵权必究。。
  2. 2、本站所有内容均由合作方或网友上传,本站不对文档的完整性、权威性及其观点立场正确性做任何保证或承诺!文档内容仅供研究参考,付费前请自行鉴别。如您付费,意味着您自己接受本站规则且自行承担风险,本站不退款、不进行额外附加服务;查看《如何避免下载的几个坑》。如果您已付费下载过本站文档,您可以点击 这里二次下载
  3. 3、如文档侵犯商业秘密、侵犯著作权、侵犯人身权等,请点击“版权申诉”(推荐),也可以打举报电话:400-050-0827(电话支持时间:9:00-18:30)。
  4. 4、该文档为VIP文档,如果想要下载,成为VIP会员后,下载免费。
  5. 5、成为VIP后,下载本文档将扣除1次下载权益。下载后,不支持退款、换文档。如有疑问请联系我们
  6. 6、成为VIP后,您将拥有八大权益,权益包括:VIP文档下载权益、阅读免打扰、文档格式转换、高级专利检索、专属身份标志、高级客服、多端互通、版权登记。
  7. 7、VIP文档为合作方或网友上传,每下载1次, 网站将根据用户上传文档的质量评分、类型等,对文档贡献者给予高额补贴、流量扶持。如果你也想贡献VIP文档。上传文档
查看更多
大型多项目援建工程的特点分析及其针对性项目管理实践 Analysis on the Particularity of Large-scale Multi-project Assistance Construction and It’s Targeted Project Management Practice 陆鑫 Lu Xin (上海建科建设监理咨询有限公司,上海 200032) (Shanghai Jianke Project Management Co., Ltd., Shanghai. Zip Code: 200032 ) [摘要]:大型多项目援建工程具有政治意义深远、投资建设模式特殊以及类型多样、数量庞大、 分布地域广阔等特点。本文分析了这些特点所导致的项目管理风险,并以上海市对口支援都江堰 市灾后重建工程为对象,着重介绍了其针对性的项目管理实践经验和方法,包括:基于协调替代 寻优方法的目标系统管理与协调、紧密结合援建特点的项目组织设计、规范的管理制度与灵活的 程序机制相结合、结合“软因素”控制的综合集成进度管理方法以及多项目信息管理系统的建设 等,旨在为提升今后援建工程的项目管理水平提供有益参考。 关键词:援建 多项目 项目管理 Abstract: There’re some particularities of the large-scale multi-project assistance construction work, such as the specific political purpose, special mode of investment and construction, as well as large number, diverse types and widely located of projects, etc. For increasing the project management level of the future assistance construction, this paper analyzes the project management risks which resulted from above those particularities, and focuses on introducing the targeted project management practice and methods of Shanghai counterpart assistance post-disaster reconstruction projects in Dujiangyan, which involves of the construction goal system management approach based on coordination alternative optimization method, targeted organizational design, coordination of standardized management system and a flexible mechanism for combining the procedures, integrated schedule management and controlling the soft factors, development and management of the multi-project information management system. Key words: assistance construction multi-project project management 1 引言 援助建设(以下简称“援建”)作为一种以政府为主导的特殊建设模式,在国与国、地区与 地区之间的相互交流中长期存在。我国于 2008 年将这一形式创造性地大规模应用于汶川地震灾 后重建工作之中,取得了良好的经济社会效应。通过援建,四川受灾地区的基础设施水平、公共

文档评论(0)

0520 + 关注
实名认证
文档贡献者

该用户很懒,什么也没介绍

1亿VIP精品文档

相关文档